background image

ADBS-3x1-30T3C Page 1 of 4

Installation Guide 

ADBS-3x1-30T3C

3 x 1 Ceiling Menu Board Tilt

REQUIRED TOOLS

OPTIONAL TOOLS

• Power driver
• 13mm Hex socket
• Crosshead Screwdriver

• Spirit Level

COMPONENT & PARTS CHECKLIST

INSTALL GUIDELINES

A

ADB-PC

 Pole Ceiling  Fixture 

QTY:3

Ref  Part name 

Qty 

A1  Ceiling Plate 

A2  Plate Covers 

A3  M8 x 70mm Screw 

A4  M8 Washer 

12 

A5  M8 Nut 

A6  Plastic Anchor 

A7  Coach Screw 

A8  Open Wrench 

A9  6mm Hex Key 

A10  M8 x 60mm Screw 

A11  End Cap 

1

A1

A2

A9

A6 A7

A5

A8

A3 A4

A10 A11

 TWO PERSON INSTALL RECOMMENDED.

•  Read and understand Installation Safety Instructions before commencing installation.
•   Atdec recommends that a professional AV installer or other suitably qualified person  

install this product.

•  Configurations should be installed in a symmetrical manner for optimal safety.
•   Place rail supports (ADB-RPJ, ADB-RUJ, ADB-WP) evenly along the length of a Rail 

segment to provide even loading of components.

•   ADB-R175 requires two rail supports (ADB-RPJ, ADB-RUJ, ADB-WP) to support a load of 

200lbs (100kg). If one rail support is used, the rail can only support 110lbs (50kg)  
maximum load.

•   Fasten ADB-RX symmetrically over the junction of Rail segments. Tighten the set screws  

of ADB-RX firmly.

•  Place ADB-P Poles and ADB-RPJ Rail Pole Joiners directly behind the centre of each screen.
•  Ensure that each ADB-R Rail is supported by at least one ADB-WP Wall Plate. 
•   When attaching displays, attach in an order that ensures stability during installation. 

Alternate the loading order such that loads are balanced across to system. Alternate the 
side onto which screens are placed to distribute load evenly.

220lbs  
100kg

Reviews: