![AT&T Partner MLS 6 Installation And Use Manual Download Page 20](http://html1.mh-extra.com/html/atandt/partner-mls-6/partner-mls-6_installation-and-use-manual_2993850020.webp)
Test the System
■
Testing the system includes testing the modules and incoming lines through the modules.
1-Module
System
2-Module
System
Connect the AC power cord to
the 206 module on a system with one
Make sure the circuit breakers on
Plug the other end of the power
each 206 module are pressed down. In
the down position, the top of the circuit
cord into a grounded wall outlet. The
module, or to the module connector on
breaker is flush with the top of the
outlet must not be controlled by a
a system with two modules. Press
switch.
module.
firmly until it clicks as it locks into
place.
The green light below the line jacks
on each module should come on. If
14
15
16
After a successful test,
disconnect the AC power
cord. Go to step 18.
Line Buttons
17
To test the incoming lines, plug a
PARTNER phone into extension 10.
Press the line button for each outside
line and listen for dial tone. lf your
system has two modules, repeat for
extension 16.
not, see chapter 7, “Troubleshoot-
ing.” (p. 7-1).
If you do not hear a dial tone for
one or more lines and you have a
1-module system,
call the AT&T
Helpline at 1 800 628-2888.
2-module system,
unplug the
power cord and repeat steps 6 and
7 (p. 2-5) to ensure that the
modules and connector are
properly installed. Test again. If it
still does not work, call the AT&T
Helpline at 1 800 628-2888.
Installing the Hardware
2-7