Chapter 2: Hardware Information
2-2
2.1
Removing the server node
2.
Hold the server node lever and press the green node latch.
3.
Firmly pull the server node out of the server chassis.
When installing only two nodes, install the nodes to node slot number 1 and 3 or number 2
and 4. Refer to section
1.5 Rear panel features
for details.
1.
Remove the screw located on the node latch.
Summary of Contents for RS720Q-E9-RS24-S
Page 1: ...2U Rackmount Server RS720Q E9 RS24 S User Guide ...
Page 12: ...xii ...
Page 46: ...Chapter 2 Hardware Information 2 22 ...
Page 52: ...Chapter 4 Motherboard Information 4 2 4 1 Motherboard and Mid plane layout Z11PH D12 ...
Page 53: ...4 3 RS720Q E9 RS24 S Series RS720Q E9 RS24 S Mid Plane ...
Page 114: ...Chapter 5 BIOS Setup 5 48 ...
Page 126: ...Chapter 6 RAID Configuration 6 12 ...
Page 144: ...7 18 Chapter 7 Driver Installation ...
Page 145: ...Appendix Appendix ...
Page 146: ...A 2 Appendix Z11PH D12 block diagram ...
Page 150: ...A 6 Appendix ...