Astria Plantation48M3 F0691 Installation And Operation Instructions Manual Download Page 8

www.Astria.US.com

126634-01A

8

INSTALLATION

Continued

Figure 9 - Elbow Offset

B

A

Screws

FIRESTOP SPACERS (FS-10)

Firestop spacers are required at each point 

where  chimney  penetrates  a  floor  space. 

Their  purpose  is  to  establish  and  maintain 

required  clearance  between  chimney  and 

combustible  materials.  When  pipe  passes 

through a framed opening into a living space 

above, firestop must be placed onto ceiling 

from below as shown in Figure 10.
They also provide complete separation from 

one floor space to another or attic space as 

required by most codes. When the double wall 

pipe passes through a framed opening into an 

attic space, the firestop must be placed into 

an attic floor as shown in Figure 11.

Figure 10 - Firestop Spacer with Living 

Space Above Ceiling

Figure 11 - Firestop Spacer with Attic 

Space Above Ceiling

Existing 

Ceiling 

Frame

Firestop 

Spacer

Screws or 

Staples 

(Min. of 8)

Firestop 

Spacer

Screws or Staples 

(Min. of 8)

PENETRATING ROOF

To maintain a 2" clearance to pipe on roof with 

a pitch, a rectangular opening must be cut.
1.  Determine center point through which pipe 

will penetrate roof.

2.  Determine  center  point  of  roof.  Pitch  is 

the distance the roof drops over a given 

span, usually 12". 

3.  Use  roof  opening  chart  (Figure  12)  to 

determine  correct  opening  length  and 

flashing required.

4.  Remove shingles around opening mea

-

sured. Cut out this section.

5.  Add  next  sections  of  pipe  until  end 

penetrates  roof  line.  Check  to  see  that 

proper clearances are maintained. Extend 

chimney by adding sections of double wall 

pipe until pipe is minimum of 30" above 

highest point of roof cutout. Termination 

and chimney must extend a minimum of 

36" above highest point where it passes 

through roof.

Pitch

Slope

Opening 

"A" Max.

Used Flashing

Model No. 

Flat

19.5"

V6F-10DM

0-6/12

26.6°

22'

V6F-10DM

6/12-12/12

45.0°

27"

V12F-10DM

Existing 

Ceiling 

Frame

19.5" Min.

30" Min.

2" Min.

2" Min.

2" Min.

Opening "A"

Figure 12 - Roof Opening Measurements

CAUTION: THE STRUCTURAL 

INTEGRITY OF THE MANUFACTURED 

HOME FLOOR, WALL, AND CEILING/

ROOF MUST BE MAINTAINED.

WARNING: DO NOT INSTALL IN SLEEPING 

ROOM OF MOBILE HOMES.

Summary of Contents for Plantation48M3 F0691

Page 1: ...with the type of gas indicated on the rating plate This appliance is not convertible for use with other gases unless a certified kit is used WARNING If the information in these instructions is not fol...

Page 2: ...actured or approved by INNOVATIVE HEARTH PRODUCTS in combination with a IHP fireplace system Proper installation is the most important step in ensuring safe and continuous operation of the fireplace C...

Page 3: ...Straps Provided Hearth Spacer Required for Combustible Floor 0 to Bottom 12 Min Each Side Hearth Extension 72 X 20 Outside Air Access Location 1 5 Airspace Back and Sides 2 Chimney Airspace Clearance...

Page 4: ...at the level of the flue gas outlet see Figure 15 page 9 FRAMING 1 Frame the opening for the fireplace using the dimensions shown in Figures 1 and 2 2 If the fireplace is to be installed directly on c...

Page 5: ...al Gap Fireplace Front Ember Protector Fireplace Front Raised Hearth Fireplace Front Elevated Ember Protector Ember Protector Seal Gap Hearth Extension MANTELS A mantel may be installed if desired see...

Page 6: ...ctions are locked together When installing double wall snap lock chimney to gether it is important to assure joint between chimney sections is locked Check by pulling chimney upward after locking Chim...

Page 7: ...24 36 48 4 3 8 16 3 8 ELBOW SET ONLY 9 3 4 25 1 2 1 12 3 4 30 3 4 1 15 34 3 4 1 18 40 1 1 21 1 4 46 1 4 1 23 3 4 49 1 4 1 1 27 3 4 56 3 4 1 30 60 3 4 1 1 33 66 1 36 71 1 1 38 1 4 75 2 41 1 4 80 1 4 1...

Page 8: ...ROOF To maintain a 2 clearance to pipe on roof with a pitch a rectangular opening must be cut 1 Determine center point through which pipe will penetrate roof 2 Determine center point of roof Pitch is...

Page 9: ...nst open edge of flashing see Figure 14 Apply waterproof caulk around perimeter of collar to provide a proper seal Figure 14 Storm Collar Chimney Pipe Waterproof Caulk Storm Collar Flashing Terminatio...

Page 10: ...Rule CAUTION All gas piping and connectionsmustbe tested for leaks after the installation is completed After ensuring that the gas valve is on apply soap and water solution to all connectionsandjoint...

Page 11: ...de of the hearth Figure 20 then tilt the top of the panel toward the firebox surround Hearth Right Face Slot Figure 20 Slots for Firebrick Walls 3 Secure the firebrick wall using two of the side retai...

Page 12: ...tion When bricks are wet any excess grout mixture on bricks will easily wipe off 2 In a heavy duty mixing bucket add equal parts cement and sand Add enough water and mix together well using a power dr...

Page 13: ...od into rings at top of screen Attach one push on nut to end of rod before attaching last ring of screen 2 Insert the round end screen rod into hole on the left and right side of smoke shelf Figure 25...

Page 14: ...ing that the gas valve is on apply soap and water solution to all connectionsandjoints Bubbles forming show a leak Correct all leaks at once DO NOT USE AN OPEN FLAME FOR LEAK TESTING AND DO NOT OPER A...

Page 15: ...2 concrete drill bit not provided 5 Place rail back on bricks and align holes Secure using 9 concrete screws provided with glass door kit 6 Secure retaining clips to top and bottom rails see Figure 30...

Page 16: ...oxes can create an excessively hot fire and should not be burned in this fireplace Always keep the fire well back from the doors and never allow flames to contact the glass WARNING Fireplaces equipped...

Page 17: ...e Re place grate with INNOVATIVE HEARTH PRODUCTS model 109496 01 grate only This grate has been designed to keep the operation of your fireplace safe and efficient TECHNICAL SERVICE You may have furth...

Page 18: ...Brick Ivory 1 3 125634 01 Hearth Red 1 125634 02 Hearth Ivory 1 4 124646 01 Rear Top Red 1 124646 02 Rear Top Ivory 1 5 124648 01 Right Red 1 124648 02 Right Ivory 1 6 124650 01 Left Red 1 124650 02...

Page 19: ...2DM 24 12DM 36 12DM 48 12DM 12 12HT 18 12HT 24 12HT 36 12HT and 48 12HT 30 OFFSET AND RETURN 30E 12DM and 30E 12HT OPTIONAL OUTSIDE AIR KIT FOR FLOOR INSTALLATION AK4F OPTIONAL OUTSIDE AIR KIT FOR SID...

Page 20: ...RIES Continued SQUARE CHASE TOP TERMINATION STL 12D ROUND TOP TERMINATIONS RLT 12D AND RLT 12HT OPTIONAL HEARTH SPACER HS48 24 ROUND WOODNOOK DHR 24 ROOF FLASHING V6F 10DM 0 to 6 12 Pitch V12F 10DM 6...

Page 21: ...delivery services IMPORTANT NOTICE A manufactured shroud which has been approved by a national testing agency for use with this fireplace may be used if installed in accordance with the instruc tions...

Page 22: ...gas Fuel products with abnormal burning characteristics including but not limited to fuel such as driftwood coal or plywood and wood products using a binder may burn at excessive temperatures and may...

Page 23: ..._____________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ _____...

Page 24: ...126634 01 Rev A 1 14 1508 Elm Hill Pike Suite 108 Nashville TN 37210 1 800 655 2008 www IHP US com P126634 01...

Reviews: