S I G N A T U R E
5
2. Checklist of quality controls passed
MA
TERIALS
INT
AKE
Raw materials
Certificates
ENTR
Y
FINISHED
PRODUCT
FINAL
SM: Coating surface control
SM:
Accelerated lifetime test
QC: Pressure test
QC: Fatigue test
SM: 100% SELF-MONIT
ORING INTEGRA
TED
IN
THE MANUF
ACTURING PROCESS ITSELF
QC: P
APER
WORK CONTROLS BY
THE
QUALITY
DEP
AR
TMENT
SM: Electrode holder water tightness control
SM: Finished visual appearance
Electrolysis
cell
Power box
Control
Cell body
Cover Base
Power supply
control
Thermoplastic
injection
Titanium coating
SM: Circuit operational tests
SM: 8-hour test at maximum load
QC: Dimensional control and surface finishing