Aston Technologies Inc.
12
Step Two
:
as shown in Picture 6-A, take down the two circlips and keep them for later
installation.
3.4
Inspect the project table after installation
No.
Inspection item
Yes
No
Remarks
1
Whether the working voltage is
consistent with the requirements of
the equipment
2
Whether the components are
installed correctly
3
Whether the bolts, screws, nuts are
tightened
Note:
Please fill in the inspection item list after the installation is finished.
3.5
Commissioning and debugging
3.5.1
Commissioning
Picture 6
-
A