ASTi Telestra Target Operations & Maintenance Manual (Ver. 2, Rev. M)
30
Copyright © 2020 Advanced Simulation Technology inc.
6.5. Security Package Installation
For the Target Security Package installation, reference the ACE Target Cold Start Procedure
(DOC-02-TEL4-TCS-1) section 6.0 “Installing
Telestra
Security Software Package” for step-by-
step instructions.
For the Studio Security Package installation, reference the ACE Studio Cold Start Procedure
(DOC-02-TEL4-ASCS-1) section 5.0 “Installing
Telestra
Security Software Package” for step-
by-step instructions.
In addition to installing the rpm package(s) during the ASTi
Telestra
Security software
installation, the DVD contains one folder labeled:
•
ASTi_SRR_Report
The “ASTi_SRR_Report” directory contains a PDF that is provided to assist in the IA
accreditation process. The PDF is generated from the non-ASTi generated DISA SRR results.
ASTi transforms the raw results generated from the DISA SRRs into a user-friendly format. The
first page shows a description of the Target platform under testing and includes information on the
OS version, ACE Target software version, STIG/SRR version and Security Package version. In
other words, it shows the configuration of the main aspects associated with generating an SRR
Report. Additionally, there is a summary of any Open, Closed, Manual Review, False Positive and
Waiver PDIs by vulnerability code. CAT I is the highest vulnerability code and CAT IV is the
lowest. Pages 2 - N show the details of individual PDIs and are sorted by current status such as
Open, Closed, etc.
Note: The RMS Status page does not display the OS software version when the optional security
package is installed.