![ashtech Reliance FS/2 Operation Manual Download Page 159](http://html1.mh-extra.com/html/ashtech/reliance-fs-2/reliance-fs-2_operation-manual_2982703159.webp)
Basic FS/2 Operation
C-1
Basi
c F
S
/2
O
p
erat
io
n
This chapter introduces you to the FS/2 handheld controller made by Husky.
The FS/2 is rugged and waterproof, but to help ensure trouble-free operation, we
recommend the following:
•
Learn the basics of FAMlog before beginning work
•
Carry a spare set of AA alkaline batteries
•
Avoid subjecting your FS/2 to temperature extremes, including bright sunlight in
a vehicle, prolonged immersion in water, or physical mistreatment.
The FS/2 (Figure C.1) leaves the factory fitted with non-rechargeable alkaline batteries
and is ready for use.
If you fit new rechargeable batteries instead, you must charge the FS/2 before use. Refer to “Replacing
Batteries” on page C-5 and “Charging Batteries” on page C-10.
C
Basic FS/2 Operation
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...