Ashcroft F5509 Installation And Maintenance Instruction Manual Download Page 10

 

Page 10 of 27 

 

 

Connection to be undertaken by authorized and qualified specialist staff only. 

 

The electrical connection of the device is to be undertaken in accordance with the relevant regulations of the VDE 

and the regulations supplied by the local utilities company. 

 

Disconnect the plant from the mains supply before wiring electrical connections. 

 

Install appropriate fuses upstream. 

 

Please refer to type label 
for configuration of 
connections. 

    Switch 1           Switch 2 

 

 

8.4  Starting up 

The precondition for start-up is proper installation of all electrical feed lines and metering pipes.  All connecting lines 

must be installed so that no mechanical forces can act on the device. 
Before start-up, the seal on the pressurized connection line must be checked. 
 

8.4.1  Zero point adjustment 

The pressure gauges are supplied calibrated at the factory, so that as a rule there is no need for calibration at the 

installation point. For devices with Micrometer pointer (see order code), zero pointer adjustment on site is possible. For 

this, proceed as follows: 

 

Equalize pressure in both chambers. 

 

Check if internal pressure was built up in the case due to 

ambient temperature effect. Open valve (position B), wait for 

pressure relief and close valve again (position A) 

 

Lift up on vent plug. 

 

Use zero pointer adjustment screw to set the pointer to zero. 

 

Mount vent plug 

 

Filled Models need to be vented before commissioning 

by opening the air valve on the upper side of instrument! 
 

 

 

8.4.2  Setting the electric contacts 

An adjustable lock is fitted in the front panel of the pressure 

gauge. Using the removable adjustment key, the contacts 

mounted on the target value indicators can be set to any point on 

the range covered by the scale. 
For reasons relating to accuracy of switching and the lifetime of 

mechanical measurement systems, the switch points should be 

positioned between 10% and 90% of the range. 

 

Place the adjustment key on the axle of the adjustable lock. 

 

Press the axle inwards, until the carrier arm grips behind the 

adjuster pin on the target value indicator. 

 

By turning the key, adjust the target value indicator to the 

desired switch point. 

Release the pressure on the axle, and remove the adjustment key. 

 

Summary of Contents for F5509

Page 1: ...tenance Instruction Manual Differential pressure gauge model F5509 F6509 for industrial application in the following configuration F5509 F6509 ATEX differential pressure gauge without switching contac...

Page 2: ...nd F6509 without switching contact 5 3 2 F5509 I and F6509 I with inductive proximity switches SJ2 N 6 4 Technical data 7 5 Labeling on the device 7 5 1 Labeling on the device for explosion risk areas...

Page 3: ...t general safety information 2 and also the following specific advice regarding the intended purposes 2 2 and through to disposal 11 3 contain important safety information which if not followed may re...

Page 4: ...er will violate the approval for hazardous area and are not permitted This also applies to installation of spare parts Possible conversations or alterations may only be carried out by the manufacturer...

Page 5: ...clouds and dust layers the ignition temperature must be specified pursuant to ISO IEC 80079 20 2 For dust clouds the maximum allowable medium temperature inside of the measuring instrument must not ex...

Page 6: ...e in differential pressure between 10 and 90 of the measuring range and a pulse frequency of 0 06 Hz the temperature increase is 10 K To avoid additional temperature increase the devices should not be...

Page 7: ...tch operating voltage 230 VAC 4 Technical data The detailed technical information can be found in the documents in the Appendix Chapter 12 5 Labeling on the device The label with the serial number and...

Page 8: ...nnection Distance between ports is 37 mm please consider this when selecting a 5 way manifold 6 3 3 Vent valve The vent valve for the housing is located on the top side If the nipple is pulled out the...

Page 9: ...tical mounting pressure ports downward When mounted in other orientation max 10 the pointers zero position needs to be adjusted see 8 4 1 Zero point adjustment Connection to be made by authorized and...

Page 10: ...n site is possible For this proceed as follows Equalize pressure in both chambers Check if internal pressure was built up in the case due to ambient temperature effect Open valve position B wait for p...

Page 11: ...erformance and recalibration is carried out at regular intervals depending on the application The precise testing cycles should be adjusted in line with the operating conditions and ambient conditions...

Page 12: ...ty data sheets 11 2 Removal When servicing the gauge the process pressure line must be depressurized the electrical connections isolated from the mains supply and special attention should be taken to...

Page 13: ...Page 13 of 27 12 2 Declaration of conformity model F5509 F6509 without contacts...

Page 14: ...Page 14 of 27...

Page 15: ...Page 15 of 27 12 3 Declaration of conformity model F5509 and F6509 inductive proximity switches...

Page 16: ...Page 16 of 27...

Page 17: ...Page 17 of 27 12 4 EU design type test certification for inductive proximity switches of types SJ2 N...

Page 18: ...Page 18 of 27...

Page 19: ...Page 19 of 27...

Page 20: ...Page 20 of 27...

Page 21: ...Page 21 of 27...

Page 22: ...Page 22 of 27...

Page 23: ...Page 23 of 27...

Page 24: ...Page 24 of 27...

Page 25: ...Page 25 of 27...

Page 26: ...Page 26 of 27...

Page 27: ...Page 27 of 27...

Reviews: