6
I n S t a l l a t I o n P l a S t I c S yS t e m Ø 2 8 0 m m
Start with the upper laundry chute
door.
1. Mount the first wall bracket
approx. 60 cm above the floor
onto the wall.
2. Put the t-piece onto the extension
piece and agglutinate* both items
at the contact surface. Afterwards
put the cap on the t-piece and
agglutinate* both items.
3. Fasten the extension piece with
the agglutinated t-piece and cap
at the wall bracket and adjust the
direction. The distance from the
middle of the t-piece to the floor
should be at least 1 meter
(compare schematics at page 3).
Summary of Contents for Easy-Line
Page 1: ...Laundry Chutes Installation Handbook ...
Page 9: ...9 N o tes ...
Page 10: ...10 N o t e s ...