ascom
Ascotel 2025/2045/2065
3.38
Planning DECT Systems
HBT_20321104_03/B0_en
5.2
Coverage Area
The supply range of a Ascotel DECT system can include many different types of
geographic geometry. In most cases the bulk of the supply range is inside build-
ings.
A DECT system always relates to a PINX (Private Integrated Exchange) in a PISN
(Private Integrated Services Network). Handover to a neighbouring DECT system
in another PINX never occurs, even if the handset is logged on in both systems.
However, the planning can be carried out for both systems as the measuring
equipment is used without PBX.
The following explanations describe the situation with a single DECT system.
Fig. 3.13:
Examples of the positioning of radio units inside buildings
Summary of Contents for Ascotel 2025
Page 1: ...Ascotel ISDN telecommunications system from ascom Ascotel 2025 2045 2065 System Manual...
Page 51: ...ascom Ascotel 2025 2045 2065 1 II HBT_20321104_01 B0_en...
Page 109: ...ascom Ascotel 2025 2045 2065 1 54 Networking the Systems HBT_20321104_01 B0_en...
Page 169: ...ascom Ascotel 2025 2045 2065 2 II HBT_20321104_02 B0_en...
Page 177: ...ascom Ascotel 2025 2045 2065 2 X HBT_20321104_02 B0_en...
Page 291: ...ascom Ascotel 2025 2045 2065 2 114 Routing Elements HBT_20321104_02 B0_en...
Page 397: ...ascom Ascotel 2025 2045 2065 2 220 Data Services HBT_20321104_02 B0_en...
Page 627: ...ascom Ascotel 2025 2045 2065 3 II HBT_20321104_03 B0_en...
Page 653: ...ascom Ascotel 2025 2045 2065 3 22 System and Expansion Limits HBT_20321104_03 B0_en...
Page 717: ...ascom Ascotel 2025 2045 2065 3 86 Planning DECT Systems HBT_20321104_03 B0_en...
Page 765: ...ascom Ascotel 2025 2045 2065 3 134 Planning a Private Network HBT_20321104_03 B0_en...
Page 767: ...ascom Ascotel 2025 2045 2065 4 II HBT_20321104_04 B0_en...
Page 771: ...ascom Ascotel 2025 2045 2065 4 VI HBT_20321104_04 B0_en...
Page 805: ...ascom Ascotel 2025 2045 2065 4 34 Connecting the PBX HBT_20321104_04 B0_en...
Page 875: ...ascom Ascotel 2025 2045 2065 4 104 Cabling Interfaces HBT_20321104_04 B0_en...
Page 897: ...ascom Ascotel 2025 2045 2065 5 II HBT_20321104_05 B0_en...
Page 929: ...ascom Ascotel 2025 2045 2065 5 30 Configuration Steps HBT_20321104_05 B0_en...
Page 971: ...ascom Ascotel 2025 2045 2065 6 II HBT_20321104_06 B0_en...
Page 995: ...ascom Ascotel 2025 2045 2065 7 II HBT_20321104_07 B0_en...
Page 999: ...ascom Ascotel 2025 2045 2065 7 VI HBT_20321104_07 B0_en...
Page 1019: ...ascom Ascotel 2025 2045 2065 7 20 Data Maintenance HBT_20321104_07 B0_en...
Page 1085: ...ascom Ascotel 2025 2045 2065 7 86 Operations Supervision HBT_20321104_07 B0_en...
Page 1087: ...ascom Ascotel 2025 2045 2065 8 II HBT_20321104_08 B0_en...
Page 1089: ...ascom Ascotel 2025 2045 2065 8 IV HBT_20321104_08 B0_en...
Page 1095: ...ascom Ascotel 2025 2045 2065 8 6 Systematic Designation System HBT_20321104_08 B0_en...
Page 1115: ...ascom Ascotel 2025 2045 2065 8 26 Designation Labels HBT_20321104_08 B0_en...
Page 1117: ...ascom Ascotel 2025 2045 2065 9 II HBT_20321104_09 B0_en...
Page 1123: ...ascom Ascotel 2025 2045 2065 9 6 Abbreviations HBT_20321104_09 B0_en...
Page 1135: ...ascom Ascotel 2025 2045 2065 9 18 Glossary HBT_20321104_09 B0_en...