5. MAINTENANCE & INSPECTION
1) Replacement of Parts
1-1) Replacement of Switch
(1) Remove the four screws, and pull out the switch plate on the front.
(2) Remove the two screws
,
and remove the switch from the switch plate.
(3) Loosen the four screws, and remove the four lead wires to the Switch.
(4) Install the lead line to a new switch.
(5) Install a new switch, installed to lead line in the Switch Plate with the two screws.
(6) Install the Switch Plate in the machine with the four screws.
26
• Always wear gloves when replacing the Cutting Blade and Threading Dies.
• Disconnect the Power Plug.
• Disconnect the Power Plug to avoid electric shock.
〈
37
〉
Switch Cover
Switch Spacer
Screw (1)
Screw (3)
lead line
Switch
Switch Plate
Screw (2)