Installing the Chassis
Chapter 2
8
Aruba 800-E
0500191
Installation Guide
November 2005
Where a large number of electrical devices are working in the same area,
additional air conditioning or air circulation equipment may be required.
Ample space
For proper air circulation, leave at least 10 cm (4 inches) clearance for the
vents on the left and right of the chassis.
Leave additional space in front and back of the chassis to access power
cords, network cables, and indicator LEDs.
Limited electromagnetic interference
For best operation, keep the 800-E Access Multiplexer and all cords and
cables at least 0.7 meters (2 feet) from fluorescent lighting fixtures, and 2
meters (6 feet) from photocopiers, radio transmitters, electric generators, and
other sources of strong electromagnetic interference.
Mounting the Chassis
1.
Make sure that your rack environment meets requirements (see
2.
Attach the rack mounting brackets to the switch chassis as shown in
F
IGURE
2-2
Attaching the Rack Mounting Brackets
8
GIG
AB
IT
SE
RIA
L
LN
K/
AC
T
LN
K/
AC
T
PO
E
AC
CE
SS
PO
INT
STA
TU
S
7
6
5
4
4
5
6
7
LN
K/
AC
T
PO
E
AC
CE
SS
PO
INT
STA
TU
S
3
2
1
0
PO
WE
R
STA
TU
S
0
1
2
3
x 6
6-32
flat head
screws
Summary of Contents for 800-E
Page 1: ...Aruba 800 E Access Multiplexer Installation Guide...
Page 12: ...System Overview Chapter 1 4 Aruba 800 E 0500191 Installation Guide November 2005...
Page 22: ...Installing the Chassis Chapter 2 14 Aruba 800 E 0500191 Installation Guide November 2005...
Page 40: ...Troubleshooting Chapter 5 32 Aruba 800 E 0500191 Installation Guide November 2005...