![Artesyn COMX-P40x0 ENP2 Manual Download Page 82](http://html1.mh-extra.com/html/artesyn/comx-p40x0-enp2/comx-p40x0-enp2_manual_2977668082.webp)
Power Domains
COMX-P40x0 ENP2 Installation and Use (6806800R95B
)
82
6.2
Power Controlling Sequence
The power sequencing of the COMX-P40x0 ENP2 differs between secure boot mode and non-
secure boot mode. For secure boot mode, POVDD should be set to 1.5V DC and is powered at
least 100 system clock cycles after the rising edge of power on reset signal. For non-secure
boot mode, POVDD should be set to GND.
Figure 6-2
Power Sequence of COMX-P40x0 ENP2
Summary of Contents for COMX-P40x0 ENP2
Page 1: ...COMX P40x0 ENP2 Installation and Use P N 6806800R95B August 2014...
Page 8: ...COMX P40x0 ENP2 Installation and Use 6806800R95B 8 List of Tables...
Page 10: ...COMX P40x0 ENP2 Installation and Use 6806800R95B 10 List of Figures...
Page 26: ...Introduction COMX P40x0 ENP2 Installation and Use 6806800R95B 26...
Page 56: ...Controls LEDs and Connectors COMX P40x0 ENP2 Installation and Use 6806800R95B 56...
Page 78: ...Functional Description COMX P40x0 ENP2 Installation and Use 6806800R95B 78...
Page 126: ...Related Documentation COMX P40x0 ENP2 Installation and Use 6806800R95B 126...
Page 128: ...COMX P40x0 ENP2 Installation and Use 6806800R95B Safety Notes 128...
Page 129: ......