Artel FiberLink 3350 Series Quick Start Manual Download Page 1

1

The FiberLink 3350 Series of fiber optic transmission systems are ready for immediate use 
and do not require any special tools or equipment. However, an Optical Power Meter, such 
as the FiberLink 6615, can be useful in determining optical loss budgets during your systems 
design and maintenance. 

The following instructions describe the typical installation procedure:
1.  Connect the video source to the video input BNC connector on the transmitter unit.
2.  Connect the video output cable to one of the two video output BNC connectors on  

the receiver unit. 

3.  Terminate any unused BNC output connector at 75 Ohms.
4.  Connect the fiber optic cable to the transmitter and receiver units.
5.  Connect the Universal Power Supply to the transmitter and receiver units.  

For box versions using DC power, please refer to figure 1.

6.  When power is applied, the green POWER LED should illuminate, indicating the  

presence of operating power. The 3G/HD/SD RATE LED will give an indication as  
described in the Indicator LED’s and Alarm Circuitry section of this manual.

7.  The system should now be operational.

Note: The Rack Card version has an additional red LED for indicating the presence of an alarm 
condition (loss of signal). Refer to Indicator LED’s and Alarm Circuitry sections of this manual.

FiberLink® 3350 Series

3G/HD/SD-SDI Transmission over one single 

mode or multimode fiber

INSTALLATION INSTRUCTIONS

Figure 1: Power Connector DC Input Polarity

9-24 Volts  

AC or DC

 (+) Positive
( - ) Negative

SDI Displays or 
SDI Equipment

3350  Tx

3G/HD/SD-SDI 
Source

3351  Rx

Fiber 
Cable

Fiber 
Cable

3350  Tx

3G/HD/SD-SDI 
Source

3351  Rx

Fiber 
Cable

3G/HD/SD-SDI 
Loop-Thru

QUICK START GUIDE

Reviews: