background image

32

Beam Brace

2

6227

Attach Brace to Gable then rotate to align with Roof Beam.

(QTY: 4)

In Front, attach Brace to Track Supports and Main Beam.

In Rear, attach Brace to lowest hole in Gable and Main Beam.

You will need for this page:

Step 12: Continued

In the front, attach the 

Roof Beam

 

Brace

 to the 

Track

 

Support

 

with one (1) bolt and nut as shown and rotate to align with 

Roof

 

Beam

. Secure to 

Roof

 

Beam

 with one (1) bolt and nut as shown.

3

4

In the rear, attach the 

Roof

 

Beam

 

Brace

 to the 

Gable

 with one (1) bolt 

and nut as shown and rotate to align 

with 

Roof

 

Beam

. Secure to 

Roof

 

Beam

 with 

one (1) bolt and nut as shown.

32BF

Tab end attaches to Roof Beam.

Angled end attaches to Gable.

Summary of Contents for RV101467H2

Page 1: ...s com Size rounded off to the nearest foot Exterior Dimensions Roof Edge to Roof Edge Width Depth Height Interior Dimensions Wall to Wall Width Depth Height Door Opening Width Height Approx Size Storage Area 10 x 14 129 Sq Ft 905 Cu Ft 123 1 4 162 3 4 92 7 8 118 1 4 157 1 2 91 5 8 55 1 2 65 3 0 m x 4 0 m 12 0 m 2 25 6 m3 313 1 cm 413 4 cm 235 9 cm 300 4 cm 400 1 cm 232 7 cm 141 0 cm 165 1 cm For p...

Page 2: ...of of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Do NOT attempt to assemble your building on a windy day The large panels can catch the wind like a sail causing them to be whipped around making construction difficult and unsafe Do NOT attempt to assemble your building before double checking that you have all the parts indicated in ...

Page 3: ...a windy day Be careful on wet or muddy ground Use Teamwork Two or more people are required to assemble your building One person can hold the parts or panels in place while the other person fastens them together and handles the tools This makes the process of assembling your building faster and safer Tools and Materials Here is a list of some basic tools and materials you will need to assemble your...

Page 4: ...collapses Note Most instruction manuals provide a warning note at the beginning of the installation step for corner panels stating that the remainder of the building assembly requires multiple hours and more than one person Do not continue beyond this point if you do not have enough time or help to complete the assembly that day A partially assembled building can be severely damaged by even light ...

Page 5: ...it is square Also try loosening the roof beams to give more play and flexibility Non alignment can also occur if your building is not level You can raise corners and shim under them to make it level Check that the panels are installed in the proper location The building should not be permanently anchored until the complete unit is assembled otherwise you will not be able to make adjustments for squ...

Page 6: ...ain your shed s attractive appearance for years Q How do I take care of dents in my shed A Proper selection of shed size including a sufficient door opening width and proper placement of your shed should minimize the possibility of damage If a dent does occur carefully push the dent out from the opposite side If the paint has been scratched or removed touch up the area as soon as you notice it Imme...

Page 7: ...ng 1 7 67293 Weather Stripping 1 8 67468 Peak Cap 6 9 66646 Washer Sheet 13 10 66382 Lower Door Guide 4 11 66183L Left Roof Trim Cap 2 12 66183R Right Roof Trim Cap 2 13 66769 Door Slide 4 14 66846 Handle 2 15 6228 Track Support 2 Key No Part No Part Description Qty List The fasteners used in each step are shown actual size at the top of each page If you are unsure which fastener to use hold it up...

Page 8: ...el 12 19 6538 Roof Panel 8 20 6797 Ridge Cap 6 21 6869 Ridge Cap 3 22 6892 Right Side Roof Trim 2 23 6893 Left Side Roof Trim 2 24 8934 Ramp 1 25 8936 Rear Floor Frame 2 26 9366 Door Track 2 27 9367 Front Floor Frame 2 28 9370 Door Jamb 2 29 9374 Front Wall Panel 2 30 10386 Roof Beam 8 31 10387 Side Floor Frame 4 32 10388 Side Wall Channel 4 33 10389 Rear Wall Channel 2 34 10391 Side Wall Angle 4 ...

Page 9: ...ASSEMBLY BY KEY NO 9 09BF Walls Floor 7 17 5 5 7 9 9 9 9 18 18 18 18 18 18 18 18 18 18 18 18 24 25 25 27 26 26 27 28 28 29 29 31 31 31 31 33 33 32 32 32 32 34 34 34 34 ...

Page 10: ...SSEMBLY BY KEY NO 10 10BF Doors 1 1 6 6 6 6 16 35 35 28 Roof 2 10 2 2 2 3 3 4 4 8 8 10 11 11 12 12 13 13 14 14 15 15 19 19 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 22 22 23 23 30 30 30 30 30 30 30 30 ...

Page 11: ...he Floor Frame Install Corners Wall Angles and Door Track Install Wall Panels Wall Channels and Door Jambs Attach Gables and Roof Beams Install Roof Panels Ridge Cap Side Trim and Corner Cap Install Doors 11BF Shed is now complete ...

Page 12: ...cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures Conc...

Page 13: ...o use on every screw and bolt 10387 Side Floor Frame 4 Step 1 Floor Frames Overlap two 2 Side Floor Frames as shown and secure with four 4 bolts Two 2 bolts must enter from bottom 1 2 Assemble a second Side Floor Frame Assembly by repeating part 1 Check that the finished length of the Assemblies is 158 5 8 402 9 cm Set aside for use in Step 5 BUILD TWO 2 FRAMES 13BF Bolts thru Bottom Bolts thru Top...

Page 14: ...lts thru Bottom Bolts thru Top You will need for this page Step 1 Continued Overlap two 2 Rear Floor Frames as shown and secure with five 5 bolts Two 2 bolts must enter from bottom 3 4 Check that the finished length of the Assembly is 119 3 8 303 2 cm Set aside for use in Step 5 11 7 8 30 2 cm Overlap Length 14A ...

Page 15: ... Drain holes must face outside the building Overlap the Ramp and two 2 Front Floor Frames so that four 4 holes align at each end as shown Insert four 4 screws in each end 5 6 Confirm that the drain holes are facing outside the building Check that the finished length of the Assembly is 119 3 8 303 2 cm Set aside for use in Step 5 8934 Ramp 1 9367 Front Floor Frame 2 7 3 8 18 7 cm Overlap Length QTY 8...

Page 16: ...o 2 Rear Wall Channels so that eight 8 holes align as shown Insert a bolt and nut through each hole Check that the finished length of the Assembly is 118 1 8 300 0 cm set aside for use in Step 10 1 2 Overlap two 2 Rear Wall Angles so that five 5 holes align as shown Insert a bolt and nut through the center hole Check that the finished length of the Assembly is 118 1 8 300 0 cm set aside for use in St...

Page 17: ...own Insert a bolt and nut through each hole Check that the finished length of the Assembly is 157 3 8 399 7 cm set aside for use in Step 10 3 4 Overlap two 2 Side Wall Angles so that three 3 holes align as shown Insert a bolt and nut through the hole Check that the finished length of the Assembly is 157 3 8 399 7 cm set aside for use in Step 7 5 Repeat Parts 1 2 to build a second set of each assembl...

Page 18: ...d for this page Finished Length 159 3 8 404 8 cm Step 3 Roof Beams Overlap two 2 Roof Beams so that the bottom slots align as shown Insert six 6 bolts and nuts as shown below 1 3 Repeat parts 1 2 to build a second Roof Beam Assembly 2 Insert two 2 bolts and nuts into slots on bottom of the Beam as shown Check that the finished length of the Assembly is 159 3 8 404 8 cm Set aside for use in Step 12 ...

Page 19: ...on each side of the Beam Overlap two 2 Roof Beams so that bottom slots align but DO NOT INSERT BOLTS Next overlap two 2 more Roof Beams to form a second Roof Beam Assembly DO NOT INSERT BOLTS 4 Insert four 4 bolts and nuts into slots from bottom Check that the finished length of the Assembly is 159 3 8 404 8 cm Set aside for use in Step 12 6 5 Place both Roof Beam Assemblies back to back to form a ...

Page 20: ...r install Door Slides Carefully bend the corner back into position Slides should be installed in Door Track prior to installation However if this step is overlooked or if the Slides need to be removed for maintenance the following procedure may be used 2 Position the Door Slides in the Door Track Check that the finished length is 118 1 8 300 0 cm Set aside for use in Step 7 Align two 2 Door Tracks ...

Page 21: ...ont Corner Back Corner You will need for this page Step 5 Frame Assembly Assemble Floor Frame with two screws at each corner as shown At the front corners insert a bolt through the bottom of the Frame as shown 1 Do not continue beyond this point unless you have enough time to complete the shed today The remainder of assembly may take several hours and requires at least two people A partially assem...

Page 22: ...re Be cautious when maneuvering and placing Panels Once Panels begin to go up it is important to be able to finish in a timely manner to reduce the possibility of wind damage to your building Bolt FRONT Leave these holes open 9374 9374 10533 10533 10533 10533 6627 6627 Double check the part numbers indicated on the Panels Front Wall Panels 9374 must be installed along front of building and Wall Pan...

Page 23: ... You will need for this page Door Slides should be in Door Track at this time Step 7 Wall Framing 2 Use the number of screws shown Leave the hole closest to the Ramp open in each Front Panel as shown above Install one Side Wall Angle Assembly first Install the Rear Wall Angle Assembly second Install the other Side Wall Angle Assembly third Install the Door Track Assembly last 1 Short Leg on Bottom ...

Page 24: ...this page Step 8 Wall Panels Lay out all Panels in the positions shown below 1 FASTEN TO WALL ANGLES FASTEN TO FLOOR FRAMES FASTEN TO WALL CHANNELS STEP 10 Use the diagram to the right when attaching Wall Panels Secure the top row to Wall Angles Secure the middle row to Wall Channels Step 10 Secure the lower row to Floor Frames Secure the circled holes to the Panel next to it 24BF NO HARDWARE NEED...

Page 25: ...nel Attach Wall Panels with screws thru all holes in top and bottom of Panels You will need for this page Step 8 Continued Working one side at a time lift the Panels into place and secure top and bottom of Panels with screws Be sure to overlap ribs as shown on the previous page 2 3 Place a bolt and nut through the center hole of the Panel everywhere Panels overlap as shown below 25BF ...

Page 26: ...nut should be visible from outside building Leave these holes open Secure Door Jambs with two 2 screws in the top and bottom of each Panel as shown 1 3 Leave the holes in the center of each Door Jamb open as shown below 2 Insert two 2 bolts and nuts into the back side of each Panel as shown below Secure the bolts with both a standard nut and an acorn nut 26AW ...

Page 27: ... by placing screws through all remaining holes in Wall Panels 1 3 Install Front Wall Channels by placing screws through all remaining holes in Wall Panels Insert two 2 bolts and nuts in both rear corners where Side and Rear Wall Channels meet 2 Install Side Wall Channels by placing screws through all remaining holes in Wall Panels Front Channel 2 9365 Install Channels on inside of building 27BF QT...

Page 28: ...acket must face center of Gable as shown 4 28BF Small Left Gable 2 6115 Large Right Gable 2 6108 Small Right Gable 2 6114 QTY 8 Bracket 4 6085 69835 Green Edge Trim Plastic Piece 69835 Green Edge Trim Plastic Piece 67521 Clear Edge Trim Plastic Piece FRONT Apply Green Edge Trim to the top edge of the Large Left Gables Small Left Gables Large Right Gables and Small Right Gables cut to length 1 Appl...

Page 29: ...tom only You will need for this page Step 11 Continued Working with one Gable at a time attach the Rear Gables to the Rear Wall Angle with screws 5 To secure Gables together position the Gable Brace as shown and insert a single bolt and nut through the second hole from the bottom only 7 Insert two 2 bolts and nuts where Wall Angles overlap 6 QTY 14 29BF ...

Page 30: ...Gables together position the Gable Brace as shown and insert a single bolt and nut through the second hole from the bottom only 9 Leave two 2 holes open on each side of the Gable peak to attach Track Support 10 Position Track Support as shown Secure Track Supports to Gable using one 1 bolt and nut Secure to Door Track using two 2 screws per side QTY 2 Gable Brace 1 6636 Track Sup 2 QTY 18 30BF Att...

Page 31: ...ap between Gables Weather Stripping Tape Top View of Gables Step 12 Roof Framing Beam End Views Angled side of Beams must face up Seal the gap between the Gables using the weather stripping tape as shown Do this at both ends of the building before installing Roof Beams 1 2 Position the Roof Beams as shown below and install using two 2 bolts and nuts per side Install the Main center Beam first 31BF ...

Page 32: ...2 Continued In the front attach the Roof Beam Brace to the Track Support with one 1 bolt and nut as shown and rotate to align with Roof Beam Secure to Roof Beam with one 1 bolt and nut as shown 3 4 In the rear attach the Roof Beam Brace to the Gable with one 1 bolt and nut as shown and rotate to align with Roof Beam Secure to Roof Beam with one 1 bolt and nut as shown 32BF Tab end attaches to Roof...

Page 33: ...uncrimped rib Crimped Rib Uncrimped Rib Be sure to carefully follow the Roof Panel Placement Order Diagram on this page 6189 6538 6538 6538 6538 6189 1 FRONT Roof Panel Placement Order If Roof Beam holes do not line up with Roof Panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up Roof Install Prep Page Use the ...

Page 34: ...Side Wall Angle at this time 3 Attach Back Right Roof Panel to Top Roof Beam only using three 3 screws 1 While installing Roof Panels use Weather Stripping Tape to seal roof ridge 5 QTY 14 Weather Stripping Tape should be applied in a continuous strip along the length of the roof Remove Edge Trim from the Left Gable under the Roof Panel 2 Install Back Left Roof Panel 4 Follow the fastener sequence...

Page 35: ...t while assembling the roof 6 35BF Ridge Cap 3 6797 6538 6797 6538 DO NOT secure end of Ridge Caps until Peak Caps are in place DO NOT fully tighten Ridge Cap bolts until you have both Ridge Cap bolts in place This will ease assembly Bolts must be fully tightened before moving on to the next page Continue to apply weather stripping Do not fasten the holes on the lower end of the Panels Double chec...

Page 36: ...el 4 6538 DO NOT FASTEN AT THIS TIME FASTEN TO NEXT PANEL WITH BOLT AND NUT FASTEN TO ROOF BEAMS WITH SCREWS FASTEN TO RIDGE CAP NEXT TWO PAGES 6869 Ridge Cap 3 6869 6538 6538 6538 6869 6869 Attach Ridge Caps with four 4 bolts and nuts DO NOT secure end of Ridge Caps until Peak Caps are in place 10 DO NOT fully tighten Ridge Cap bolts until you have both Ridge Cap bolts in place This will ease ass...

Page 37: ... Roof Beams using six 6 screws per Panel Insert bolt and nut in middle hole where ribs overlap 13 Secure Front Roof Panels to Gables using seven 7 bolts and nuts per Gable 14 Attach Ridge Caps with four 4 bolts and nuts DO NOT secure end of Ridge Caps until Peak Caps are in place 16 Finish Weather Stripping the Roof and cut the tape just past the end of the Roof Fold end of tape under roof edge 15...

Page 38: ...ts and nuts on each end 1 3 Position the Roof Trim Caps as shown below and secure with a screw 2 Position Roof Trim as shown below and secure with screws Do not fasten the last screw on each Corner Trim Cap R 2 Peak Cap 6 QTY 10 QTY 12 Roof Trim 2 6015 Left Roof Trim 2 6893 QTY 4 38BF 6893 6892 6015 Right Roof Trim 2 6892 Trim Cap L 2 6893 6892 6015 ...

Page 39: ... Handle hole Place tab end of Brace under Vertical Door Brace Attach Vertical Door Brace to Door with three 3 screws Attach the Door Handle and Door Handle Brace to the Door with two 2 bolts and nuts as shown Do not fully tighten the bolts that hold in the Door Handle until the Vertical Door Brace is in place 1 2 Rotate the Door Handle Brace to align it with the Vertical Door Brace as shown Secure...

Page 40: ...is page Step 15 Continued QTY 6 Door Guide 2 Horiz Brace 2 10497 Slide Horizontal Brace over Door edge and secure with one 1 bolt and nut in top and bottom 3 4 Secure the Door Guides and Lower Horizontal Door Brace as shown below Repeat steps for second Door 40AW ...

Page 41: ...Front Floor Frame track at about the half open position 1 Rotate the Door forward until it is vertical and align the Door Slides with the Door 2 Insert two 2 Black Screws into each Door Slide as shown below Repeat steps for second door 3 If Doors do not align raise or lower one side of the Door by placing the Door screws through a different set of holes in the Door Slide Door Adjustment You will n...

Page 42: ...Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instructions Anchoring into Wood Post Use 1 4 6 mm Wood Screws There are 1 4 6 mm dia holes provided in the frames for proper anchoring OVER THE BEAMS AND INTO THE GROUND 1 2 1 2 IMPORTANT An Anchor Kit may be purchased online at www arrowsheds com You can also purchase one over the phone by calling 1...

Page 43: ...ust does appear on your shed we recommend treating those areas as soon as possible following the paint supplier of your choice instructions Our customer service department can provide the paint tinting formula for matching the color of your shed We also have touch up paint available for repairing small nicks and scratches Roof Keep the roof clear of leaves and snow Heavy amounts of snow on the roo...

Page 44: ...cing Great for garage basement or the back of any door Fits all Arrow storage buildings ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18 m of steel cable and 4 cable clamps No digging or concrete pourin...

Reviews: