![ARMA EC142 Installation Manual Download Page 6](http://html1.mh-extra.com/html/arma/ec142/ec142_installation-manual_2973608006.webp)
EC142 Gate Installation
Quick Start Guide Rev002
Customer Support
1 800 371 0735
A Division Of Countermeasures Security Solutions Inc.
Page | 6
3. Post Placement
Steps:
3.1. Consult customer specification for post diameter, depth below grade and method of
installation below grade.
3.2.
“A” = Clear Opening between Gate Latch Post and Main Gate Post per customer
specification. The measurement is from inside to inside of post.
3.3. Centre-To-Centre Spacing between Main Gate Post and Counterbalance Gate Post is
determined by the following formula: B (Post Spacing) = (A / 2) -
11.0”