
28
Quick Start Guide: 750 Series Modular Switches
Connecting Supervisor Cables
Chapter 4: Cabling the Modular Switch
Figure 4-4: Supervisor CCS-750-SUP100
Figure 4-5: Supervisor CCS-750-SUP25
•
Console (Serial) Port:
Connect to a PC with RJ-45 to DB-9 serial adapter cable. Default switch
settings include:
•
9600 baud
•
No flow control
•
1 stop bit
•
No parity bits
•
8 data bits
The supervisor cards must be installed in one of the two slots designated for them. They are shown in
for the switches.
1
Supervisor status LED
5
Switch card status LED
9
SFP and RJ-45 Ethernet
management ports
2
Supervisor active status LED
6
Fan status LED
10
RJ-45 Serial management port
3
PSU status LED
7
Uplink status LED
11
USB Port
4
Line card status LED
8
Supervisor/Uplink ports
(2x QSFP100)
12
Release
1
Supervisor status LED
5
Switch card status LED
9
SFP and RJ-45 Ethernet
management ports
2
Supervisor active status LED
6
Fan status LED
10
RJ-45 Serial management port
3
PSU status LED
7
Uplink status LED
11
USB Port
4
Line card status LED
8
Supervisor/Uplink ports
(4x SFP25)
12
Release