● Assembled Tinker Tie Kit starts here:
3. After soldering all the SMD components, it’s time to install the through hole
components.
a. Begin by taking out the header pins from both the Trinket and the charger
bags.
b. Snap off a section of three pins from the headers that came with the
Trinket