User’s Manual –
A
REBO
S Heavy Duty Shelf 875 kg
4
3.
Assembly
3.1 Before Assembly
•
Remove all packaging material and check that all the parts are included.
•
Check the product for transport damage before assembling.
•
Assemble the product on a clean and level surface (e.g. carpet) to avoid damage.
•
Use a rubber mallet to avoid damaging the material.
•
Place the unit on a level surface. Otherwise this will compromise safety, or the maximum
supporting capacity.
•
Only use plugs and screws suitable for the type of wall and weight of the shelves. Plugs,
screws and tools for wall mounting are sold separately.
•
Exclusion of liability: There is no liability
–
also not for secondary damage
–
if the bug was
caused in order to wrong or unintended installation.
3.2 Parts
3.3 Installation
•
Assemble the first shelf support as shown in diagram. For this fix two of the girders
C
and
D
at the corner pieces (
B
).
•
Fix the shelf support in the middle of both girders and bend the connector tabs, so the
support cannot move out anymore.
•
Connect each of the corner pieces (
B
) with one other by using the included couplers (
F
).
•
Place the shelves (
A
) on each level.
•
Fit the plastic feet (
G
) on the top and bottom ends of the corner pieces.