Maintenance procedures
Liite 2 (13)
13
Securing the high voltage connectors
1. Remove the High Voltage Disconnect.
2. Open the right side panel.
3. Make sure that the orange high voltage connectors are properly in place and
the locks are engaged.
4. The smaller connectors have a three stage lock. To remove release the first
clip. Press the orange button and pull the connector. Press the black button and
pull the connector.
5. To install push the connector to the socket. Lock the clip by pushing it.
6. The larger connector is locked when the locking lever is parallel with the
cords.
Summary of Contents for eSled CSC 2015
Page 29: ...Liite 1 3 9 1 eSled CSC 2015 Operator s manual 26...
Page 38: ...Liite 1 12 12 Kuvio 3 Suositeltu tunnistehierarkiarakenne tavallisessa kokoonpanossa...
Page 44: ...Liite 1 18 18 Kuvio 6 Esimerkki Akuston datalehti...
Page 46: ...Liite 1 20 20 Kuvio 7 Esimerkki vaatimusm ritys...
Page 53: ...Liite 2 0 eSled CSC 2015 Operator s manual ARCTIC POWER 11 16 2015 Version 0_5_0...
Page 78: ...Liite 2 25...