Service Support Spirit
Unique Solution
WWW.ARCBRO.COM
13
Step 2: Install longitudinal rail and control unit
Note: Before installing the SCOUT-2 machine, you need to finish manufacturing the material
table where the machine is installed. The material table needs to reserve bolt holes for fixing the
base.
The machine is cut off.
1.
Take out two sections of the longitudinal rails structure.
Note: If the machine is 6 meters or there is a cut-off requirement, First the two bases need to be
connect;