01945 410950
http://www.arborgardensolutions.co.uk
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR
Triple Wheelie Bin Storage Assembly Instructions
Before you commence the assembly process, we recommend that you read these instructions
thoroughly beforehand to familiarize yourself with the assembly process and to also check that
you have the correct components. If for any reason you need assistance, you can find our
contact details on the top of page of these instructions.
We highly recommend that any assembly is carried out on a flat, level surface if possible and
that you use another person to assist you if necessary for your convenience all guide holes are
pre-drilled.
You can check our
YouTube channel
for assembly video.
Package contents:
•
3x Back panel
•
3x Doors
•
2x Side panels
•
3x Roof
•
3x Metal bards
•
1x Back bar
•
1x Front bar
•
2x Spacer blocks
•
1x Spacer bar
•
2x Middle Section divider
•
60mm screws
•
85mm Screws
•
32mm Black screws
•
Tools required:
Electric screwdriver with No2 Pozidrive
bit or No2 Pozidrive screwdriver