background image

01945 410950 

[email protected]

 

http://www.arborgardensolutions.co.uk

 

Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR 

 
 

 

Triple Wheelie Bin Storage Assembly Instructions 

Before you commence the assembly process, we recommend that you read these instructions 
thoroughly beforehand to familiarize yourself with the assembly process and to also check that 
you have the correct components. If for any reason you need assistance, you can find our 
contact details on the top of page of these instructions.  
 
We highly recommend that any assembly is carried out on a flat, level surface if possible and 
that you use another person to assist you if necessary for your convenience all guide holes are 
pre-drilled.  
                                     You can check our 

YouTube channel

 

for assembly video.  

                                                                     

 

Please click here

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Package contents: 

 

3x Back panel

 

 

3x Doors

 

 

2x Side panels

 

 

3x Roof

 

 

3x Metal bards

 

 

1x Back bar

 

 

1x Front bar

 

 

2x Spacer blocks

 

 

1x Spacer bar

 

 

2x Middle Section divider

 

 

60mm screws

 

 

85mm Screws

 

 

32mm Black screws

 

 

 

 Tools required: 

Electric screwdriver with No2 Pozidrive 
bit or No2 Pozidrive screwdriver

 

 

Reviews: