AQUAPHOR RO-101S Owner'S Manual Download Page 11

11

• Let the water flush through RO for 1 hour.*
• Close the clean water faucet.

Step 4

Flushing the conditioning cartridge К7М / К7ВМ  

• Close the clean water faucet and fill in the 

storage tank. This will take 30–50 minutes, 
depending on water pressure. 

• Open the clean water faucet and then wait until 

all of the water flows out from the storage tank.  

• Repeat these steps two more times.
• Close the clean water faucet.
• When the tank is full, RO is ready for operation. 

 NOTE: 

 In total, the general flushing of filter and 

membrane cartridges and startup time will take 
you about 3 hours.

10. Replacing cartridges

The membrane cartridge service life directly 
depends on operation of the preliminary wa-
ter treatment unit (cartridges К5 / К1 and K2). 
Therefore, it is always very important to replace 
the filtering cartridges in a timely manner.  

Replacing cartridges К5 / К1 
and K2 (figure 12):

1.  Set the shutoff valve on the connection node 

into the closed position, and then open the 
clean water faucet to discharge any pressure.  

2.  Press the button above the cartridge, and 

then rotate the used filter cartridges К5 / К1 
and (or) K2 in a clockwise direction to remove 
the used cartridge. 

3.  Install the new cartridges К5 / К1 and (or) K2 

according to Table 2.

4.  Press the button above the cartridge, and then 

rotate the membrane cartridge in a clockwise 
direction to remove it.  

5.  Make sure the service cap is installed in the 

housing (figure 1, position 10b), figure 13.

6.  Set the shutoff valve on the connection node 

into the open position.

*  Depending on the storage, transportation and operation 
conditions, the complete flushing of membrane cartridge may 
take up to 24 hours.

7.  Open the clean water faucet and flush the 

preliminary water treatment cartridges for 
around 20–30 minutes.  

8.  Set the shutoff valve on the connection node 

into the closed position. 

9.  Install the membrane cartridge instead of the 

service cap. 

10. Interchange the positions of К5 / К1 and K2 

cartridges.

11.  Set the shutoff valve on the connection node 

into the open position and close the clean 
water faucet.

12. Make sure that RO connections are sealed.

Stop button

Figure 12.

 Cartridge installation

Figure 13.

 Installation of the membrane  

cartridge service plug

Summary of Contents for RO-101S

Page 1: ...AQUAPHOR RO 101S RO 102S RO 101S EU RO 102S EU RO 101S IL RO 102S IL in further RO REVERSE OSMOSIS SYSTEM OWNER S MANUAL...

Page 2: ...d operation principles 6 5 RO installation 7 6 Clean water faucet installation 8 7 Drain saddle installation 9 8 Slotted plug installation 10 9 Starting RO 10 10 Replacing cartridges 11 11 Recommended...

Page 3: ...atically rinsed away through the drain leaving you with only high quality delicious water for your use 1 Operational parameters Operating temperatures Maximum 38 C 100 4 F Minimum 5 C 41 F Operating p...

Page 4: ...installing the appliance into a local water supply it is recommended that you conduct a full water analysis If the water analysis does not correspond with the requirements the life of the filtration...

Page 5: ...phor RO 102S Aquaphor RO 101S IL 5 1 pc Replacement filter cartridge K7B for Aquaphor RO 101S EU Aquaphor RO 102S EU Aquaphor RO 102S IL 5 3 JG connecting tubes 6 JG tube 3 8 d 9 5 mm 1 pc JG tube 1 4...

Page 6: ...unds non organic compounds and salts while sof tening water Water conditioning block 5 includes the min eralizing cartridge K7M for RO 101S RO 102S Aquaphor RO 101S IL or K7BM for RO 101S EU RO 102S E...

Page 7: ...Take care to ensure that the de livery tubes are pulled freely without over bend ing RO must be installed on a flat even solid surface as installation on an uneven surface may cause vibration or nois...

Page 8: ...ng O Ring is located correctly in its place and not damaged during installation Connection of JG tubes Pull the locking clip 2 off the plastic plug 1 Then install the previously wetted end of the tube...

Page 9: ...he drain saddle on most drain pipes is of 40 mm diameter 1 Apply the part of the collar with the fitting to the pipe to determine the optimal position of the collar and the pipe hole 2 Drill a 7 mm ho...

Page 10: ...s Cartridge type BLACK K2 BLUE 5 1 RED Service Cap WHITE 7 7 Make sure the service cap is installed in the housing Remove the shrink film from the cartridges Rinse the sealing O Rings of the cartridge...

Page 11: ...ssure 2 Press the button above the cartridge and then rotate the used filter cartridges 5 1 and or K2 in a clockwise direction to remove the used cartridge 3 Install the new cartridges 5 1 and or K2 a...

Page 12: ...rtridge and the resulting loss of sealing of the RO connections it is not recom mended to dissemble it without a fully qualified maintenance specialist If the RO connections are leaking immediately cl...

Page 13: ...maintains the correct drinking water salt balance You should replace the post filter every 6 months 13 Warranty Installation operational storage and transpor tation rules described in this manual sho...

Page 14: ...com pletely opened Open the shutoff valve and faucet completely One of the replacement cartridges needs to be replaced Checkwhichcartridgeneedstobereplacedaccord ing to the resource life and replace t...

Page 15: ...O at aquaphor com register for manufacturer s warranty Installation information Installation is carried out Name of the company which carried out installation Name of the service engineer Service engi...

Page 16: ...r date of manufacture and quality control are shown on the product s serial number label The manufacturer reserves the right to make improvements to the design of the water purifier withoutreflecting...

Reviews: