AQUAPHOR DWM-203 Performance Manual Download Page 8

8

 

 

 

  6. DWM-203 run 

 

 

Step 1. Connection of delivery 
pipes

 

 

Connect the delivery pipes according to the 

diagram shown in fig. 9.

 

 

To the 
drainage collar

 

 

 
 
 

Step 2. DWM-203 
preoperational phase

 

 

Remove the film wrapper from the 
modules.

 

From 

junction point

 

 
 

 

Fig. 9

 

To the tap 
with clean 
water

 

 

Remove the slipping plugs from the modules (if any).

 

 

Rinse the O-rings of the modules under water.

 

 

To  install  the  module, 

insert  it  into  the  appropriate 

collector until it stops and turn to the right along the arrow, 

as shown in fig. 10a, until it clicks.

 

 

To detach the module, 

push the stop button all the way 

to the stop and, while holding it, turn the filter module to 

the left in the direction of the arrow, as shown in fig. 10b 

and remove it.

 

 

Install modules and utility blind flange, as shown in fig. 11.

 

 

Insert the plug of electric power supply into a socket, and 

the  jack  plug  from  the  power  supply  to  the  DWM-203 

connector (fig. 12).

 

Utility blind flanges 

(supplied) (12, fig. 1)

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig. 10а 

Fig. 10b

 

 
 
 
 
 
 
 
 
 
 
 
 

 

Fig. 11

 

Fig. 12

 

К5

К2

Summary of Contents for DWM-203

Page 1: ...AQUAPHOR Water filter DWM 203 Performance manual Aquaphor LLC Russian Federation...

Page 2: ...ineralized the greater the tap water pressure is required for the performance DWM 203 Materials DWM 203 are safe non toxic and do not release into the water hazardous substances for human health and t...

Page 3: ...kage 5 Drainage collar 8 1 package 6 Utility collar 9 2 pc 7 Key 10 1 pc 8 Tap for clean water 11 1 package 9 Performance manual 1 pc 10 Installation instruction 1 pc Voltage input 100 240 V AC Input...

Page 4: ...clean water at any time in the required quantities the DWM 203 is equipped with a storage tank for clean water On the front the DWM 203 is covered with a decorative panel in which there is an electro...

Page 5: ...for clean water and DWM 203 In this case pay attention to the fact that the supply tubes pass freely without fractures and bends fig 3 DWM 203 must be removed or insulated from heat sources cookers bo...

Page 6: ...on the threads of junction point Close the inlet tap of the connection unit and having supplied water from the cold water supply line make sure that the connection is hermetically sealed Joint the tu...

Page 7: ...ng for the tube Drill a hole 7 mm in diameter in the wall of the pipe in the marked location Remove the cut part in the form of a circle from the pad 1 Fig 6 Remove the protective film 2 from the pad...

Page 8: ...module insert it into the appropriate collector until it stops and turn to the right along the arrow as shown in fig 10a until it clicks To detach the module push the stop button all the way to the st...

Page 9: ...ity plugs from the seats of the reverse osmosis membrane unit and install the membrane modules in their place as shown in fig 14 Switch in the input tap of the junction point to the position Opened LE...

Page 10: ...the filter units indicates the unworked resource of the modules LED indicator 5 see figure 15 will flash in the event of a malfunction at the rest of the time it is lit continuously which indicates t...

Page 11: ...ress and hold the PUSH button for at least 7 seconds to reset the module resource The light indication of the pre treatment unit will change from a flashing mode to a constantly flashing mode and the...

Page 12: ...ot use the system to purify water of unknown quality that has not undergone additional disinfection Purified water is not subject to long term storage We recommend to use fresh filtered water Utilizat...

Page 13: ...time resource of replaceable filtering modules Name Service lifetime resource Preliminary water treatment unit Module 5 3 4 months 1 Module 2 3 4 months 1 Block of reverse osmosis membranes Replaceabl...

Page 14: ...be replaced Plug of power unit is not inserted into the socket Do insert plug of power unit into the socket The power supply plug is not inserted into the DWM 203 coaxial connector Insert the power su...

Page 15: ...DWM maintenance service Date Foreman Work type Note...

Page 16: ...nking Water without reflecting them in the passport Drinking water machine Aquaphor DWM 106 31C trade name Automata drinking water machine Aquaphor DWM 203 TS 3697 049 11139511 2014 Certificate of con...

Reviews: