Page - 78
ICM Digital
Three-Phase
Monitor
Standard
Three-Phase
Monitor
1. Deactivate power to the unit.
Confirm that power is off to all three legs
using an electrical test meter set for the correct voltage.
2. Switch position of the incoming power wires at each leg as follows, re-
connect power and attempt to restart the unit. If the unit fails to start,
disconnect power. Verify off and proceed to the next leg.
l
Switch incoming power wires at L1 and L2 on the line side to the
contactor.
l
Switch incoming power wires at L1 and L3 on the line side to the
contactor.
l
Switch incoming power wires at L2 and L3 on the line side to the
contactor.
3. When heat pump starts, disconnect power and verify off. Then confirm all line voltage connections are securely
tightened. Reconnect power.
l
If the heat pump does not start, contact AquaCal
®
for further assistance. See "
2.12 Viewing System Information
The heat pump model, serial number, and firmware version can be viewed in the
information menus.
IF UNIT IS ASLEEP,
SWIPE TO WAKE UP
A
PRESS MENU
BUTTON
B
USE ARROWS TO
"SYSTEM"
C
PRESS "ENTER"
1
USE ARROWS TO MENU
"INFORMATION"
2
PRESS ENTER TO VIEW
3
USE ARROWS TO VIEW
"UNIT SERIAL NUMBER"
4
USE ARROWS TO VIEW
"UNIT MODEL NUMBER"
5
USE ARROWS TO VIEW
"FIRMWARE VERSION"
MENU TO EXIT, PRESS
& HOLD TO STATUS
2
-
A
ppe
ndi
x
Summary of Contents for SunPower SP05
Page 2: ......
Page 70: ...Page 66 Water Source WS10 Water Source WS03 WS05 SunPower SP05 2 Appendix ...
Page 76: ...Page 72 l Follow all National Electric Codes NEC and or State and Local guidelines 2 Appendix ...
Page 77: ...Page 73 2 Appendix ...
Page 79: ...Page 75 2 10 Menu Trees 2 Appendix ...