Page - 20
1.6 External Equipment
1.6.a Connecting a Call Flex
To support a direct connection to a call flex accessory, AquaCal
®
heat pumps are equipped with optional
terminal blocks on the microprocessor. The microprocessor is located on the low-voltage side of the electrical
enclosure.
The call flex accessory can override a circulation pump to provide water flow to the heat
pump when the set temperature is not met. For ordering information on the accessory, see
"
Call Flex Accessory (# 0030-LEDS)
Connecting a Call Flex
DANGER
Failure to heed the following will result in injury or death.
l
Deactivate power while routing wiring to control board.
l
Follow all National Electric Codes (NEC) and/or State and Local guidelines.
WARNING
Failure to heed the following may result in injury or death.
l
This section is only for qualified installers who are familiar with the swimming pool and spa safety standards.
l
The installer must be familiar with service industry techniques.
NOTICE
Failure to heed the following may result in damage to equipment.
l
The wire size connecting the controller must be 22-gauge (minimum), 2-conductor, low-voltage wire.
Connection Points to the Microprocessor
1. Deactivate power to heat pump.
2. Remove heat pump electrical access panel.
3. Route 22-gauge (minimum), 2-conductor, low-voltage wires
to the low voltage side of the electrical enclosure. Follow all
National Electric Codes (NEC) unless State or Local
guidelines supersede.
4. Connect the controller wires to the port labeled "Call Flex"
on the microprocessor as indicated.
5. Reattach heat pump access panel.
6. Apply power to heat pump.
7. Configure the heat pump to indicate an installed Call Flex.
1
-
Ins
ta
ll
at
ion
Summary of Contents for GBB
Page 2: ......
Page 25: ...Page 21 Configure Call Flex Enter Installer Menus then proceed 1 Installation...
Page 29: ...Page 25 1 Installation...
Page 32: ...Page 28 1 Installation...
Page 36: ...Page 32 1 Installation...
Page 37: ...Page 33 Configure for Scheduled Mode Enter Installer Menus then proceed 1 Installation...
Page 41: ...Page 37 1 Installation...
Page 43: ...Page 39 1 Installation...
Page 46: ...Page 42 1 Installation...
Page 50: ...Page 46 1 Installation...
Page 53: ...Page 49 1 Installation...
Page 55: ...Page 51 1 Installation...
Page 74: ...Page 70 l Follow all National Electric Codes NEC and or State and Local guidelines 3 Appendix...
Page 77: ......
Page 78: ......