M o u n t t h e C o n t r o l B o x
1. The Control Box must be mounted
vertically on a flat surface and a
minimum of 5 ft (1.5m) horizontal
distance (or more, if local codes
require) from the pool/spa.
2. Locate a position for your Control
Box within 10 ft (3½ meters) of
where the Cell will be installed and
within 2 ft of the power supply to
ensure enough wire is available.
3. Because the box acts as a heat sink
dispersing heat from inside the box,
do not block the four sides of the
Control Box.
Do Not
mount the
system inside a panel or tight
enclosed area.
4. Secure the hanging rack on the wall
using the enclosed screws and anchors. 1/4” (8mm)
drill bit should be used for the anchor holes.
5. Hang the Control Box on the mounted hanging rack.
4
3
2
1
1. Flow sensor connectors
2. Cell connectors
3. Bonding
4. Power Cord
6. Hardwire the power cable to the time clock as indicated in the instructions below. *Check the label on
the side of the Control Box for the proper voltage specification on your system (i.e. 120v or 240v).
7. Do not extend the cable leading to the cell. This decreases the system’s efficiency and will void
warranty coverage. Please contact the manufacturer for installations demanding a longer cell cable.
6