background image

 

 

15 

7.5

 

WORKING POSITION  

Adjustment of the working depth, i.e. the regulating effect, occurs via the support wheels, 
the pre-load of the spring, the adjustment of the pressure angle of the star rings, and the 
forward speed. The contact pressure must not be increased via the top link! In this regard, 
it must be stated that the frame of the implement must be adjusted horizontally. 

 

Figure 5 

7.5.1

 

ADJUSTMENT OF THE PRE-LOAD FORCE PER ARM 

The pre-load force is increased / reduced by releasing the quick-release 
fastener and adjusting the spring pre-load through the hole pattern. 
 
In  order  to  actuate the quick-release fastener for  adjustment  of the  pre-
load  force,  the  clamping  mechanism must  be  released. This  is  done  by 
pressing the spring-loaded bolt, which clamps the quick-release fastener 
onto the hollow profile. 
This  releases  the  quick-release  fastener  and  it  can  also  be  turned 
downward and out of the way if there is a lack of space. 
 
Thanks to the handle, the pre-load plate of the spring can be adjusted up 
or  down in the 2nd step. When the pre-load plate is pulled out, the pre-
load force on each ring increases. When the pre-load plate is pushed in, 
the pre-load force is reduced. 
 
In the last step, the quick-release fastener must be pulled forward again 
and the clamping mechanism must be released. 

 

Figure 6 

 

1:

 Pre-load plate with handle 

2:

 Quick-release fastener 

7.5.2

 

ADJUSTING THE PITCH 

Press the quick-release fastener lever forward (in the 
direction of travel) to unlock the ring fastening. Turn the 
arm holder to adjust the pitch of the ring. The angle is 
adjusted  by  5 degrees  with  each  locking  notch.  The 
ring is again fixed in place by releasing the lever. 

 

Figure 7: Pitch for both rings 30° 

 

1:

 Fastening lever 

2:

 Locking notch 

3:

 Ring holder 

 

Fig. 8: Pitch 30° and 0° 

 

Summary of Contents for RH 600 M1

Page 1: ...ROTARY HOE RH 600 M1 OPERATING MANUAL PLEASE READ CAREFULLY BEFORE INITIAL OPERATION Translation of the original operating manual Version 2 3 EN US Item number 00602 3 329...

Page 2: ...Working position 15 7 6 Quick lift factory mounted 16 8 MAINTENANCE AND CARE 17 8 1 General maintenance instructions 17 8 2 Instructions for regular maintenance 17 8 3 Replacing star rings bearings 1...

Page 3: ...nting kit for PS 120 300 on RS 600 27 16 2 Accessories kit for dispersion plate installation RS600 27 16 3 platform kit 27 16 4 Lighting with warning signs both sides 28 16 5 Operating hours counter 2...

Page 4: ...s from 07013 01000 Year of manufacture from 2021 Relevant EC directives Directive on machinery Machinery Directive 2006 42 EC In the planning design construction and placement on the market of the mou...

Page 5: ...uestions concerning the handling of the Rotary Hoe To order spare parts To commission service and maintenance tasks Service address APV Technische Produkte GmbH HEADQUARTERS Dallein 15 3753 H tzelsdor...

Page 6: ...s the associated risk Intended use also includes compliance with the operation service and maintenance conditions that are prescribed by the manufacturer The implement must only be used maintained and...

Page 7: ...coupling them from the tractor When mounting the implement the operator must particularly proceed in compliance with the tractor requirements as stipulated in the operating manual and the operator mus...

Page 8: ...implement parts are lost or broken they must be immediately replaced with original parts by trained specialist personnel Accessories must be properly mounted in compliance with standards by qualified...

Page 9: ...oking for leaks Liquids that escape under high pressure hydraulic oil can penetrate the skin and cause severe injuries If there are injuries seek medical attention immediately Danger of infection Befo...

Page 10: ...d it is not required Caution is required after switching off the PTO shaft Danger due to the centrifugal mass that is still rotating Do not get too close to the implement during this time Work can onl...

Page 11: ...ts or seed When filling the seeder never stand under a suspended load When driving up to the implement with seed ensure that no one is standing on or around the implement During the loading procedure...

Page 12: ...prior to operating Observe all operating and safety warnings Do not position yourself in the danger zone swivel area 6 2 HAZARD LABELS Caution crushing area Never reach into the crush hazard zone as...

Page 13: ...anks to the toolless quick release fastener on each arm it is possible to adjust the pitch from 0 30 in 5 increments Because the working rings are arranged back to front starting from the middle later...

Page 14: ...not forget to hook in the securing chains and close the stop tap When uncoupling the implement you must offload the hydraulic hose through the float position before pulling it out CAUTION Before unfol...

Page 15: ...ener onto the hollow profile This releases the quick release fastener and it can also be turned downward and out of the way if there is a lack of space Thanks to the handle the pre load plate of the s...

Page 16: ...n the arm is lifted By folding up the arm a width of approx 150 mm will not be worked Figure 9 1 Arm 2 Pin for quick lift Fig 10 Pin in parking position Fig 11 Quick lift lifted out position Fig 12 Ne...

Page 17: ...e guide slots must also be lubricated Do not use a high pressure cleaner to clean bearing parts and hydraulic parts Cleaning with excessive pressure can damage the paint Use environmentally friendly a...

Page 18: ...t the bearing Now take the new bearing Assembly occurs in the reverse order Figure 16 8 4 REPAIR AND CORRECTIVE MAINTENANCE Contact the manufacturer if the implement fails or is damaged The contact da...

Page 19: ...km h 2 25 depending on crop Working depth mm 0 30 Star rings units 40 Line spacing of the star rings mm 150 Angle of inclination 0 30 adjustable in 5 increments Feeler wheels standard equipment units...

Page 20: ...S and RH RH 600 M1 PS 120 E RH 600 M1 PS 120 H RH 600 M1 PS 200 E RH 600 M1 PS 200 H RH 600 M1 PS 300 E RH 600 M1 PS 300 H Part for mounting Transport dimensions for RH and PS combined LxWxH m 1 65x2...

Page 21: ...ite red slanted bars in accordance with DIN NORM or the respective country specific STANDARDS Any part posing a traffic hazard or dangerous parts tine wheels must be covered and additionally identifie...

Page 22: ...ed implement The front axle of the tractor must be loaded with at least 20 of the net weight of the tractor All of these values can be determined with this calculation Figure 20 Information TL Unladen...

Page 23: ...ter the calculated total weight and the permissible total weight that is specified in the tractor s operating manual 5 Calculating the actual rear axle load TH tat In the table on page 12 3 enter the...

Page 24: ...DISPOSAL 14 1 DECOMMISSIONING THE IMPLEMENT To ensure that the implement retains its full functionality even during a longer period of non operation it is important to take precautions for storage Co...

Page 25: ...s of the working pass increases significantly with the working speed The aggressiveness increases when more pressure is applied to the arms 15 1 HITTING THE RIGHT GROWTH PHASE Measures that are perfor...

Page 26: ...he field on warm days when the maize plants become more flexible due to the heat from the sun and therefore do not break Beets 1 Use at a growth height of 3 4 cm light to medium aggressiveness Vegetab...

Page 27: ...DISPERSION PLATE INSTALLATION RS600 For fastening the dispersion plates of the PS120 200 300 on the RH 600 M1 Order number 07009 2 022 Figure 23 16 3 PLATFORM KIT A suitable platform kit is available...

Page 28: ...25 16 5 OPERATING HOURS COUNTER A vibration sensor records the implement s vibrations and starts the operating hours counter Order number 00602 3 659 Figure 26 16 6 ACCESSORIES KIT LINKAGE SENSOR TOP...

Page 29: ...tallation 27 Disposal 25 Energy efficient use 18 Feeler wheels 19 Guarantee 5 Hazard labels 12 Hydraulic system 9 Hydraulic system diagram 21 Hydraulics 19 Identification 5 Intended use 6 Lighting cir...

Page 30: ...30 NOTES...

Page 31: ...31 NOTES...

Page 32: ...APV Technische Produkte GmbH Zentrale Dallein 15 3753 H tzelsdorf Austria Tel 43 2913 8001 office apv at www apv at...

Reviews: