Page 28
Translation of the original operating manual
19.6 Pneumatic seeder mounting kit for the
roller of the GK 250/300 M1
(Please note that the pneumatic seed drill must be mounted in
compliance with ISO 4254-1.)
Items included:
2nd support for the roller, PS bracket, installation material
Order number:
06008-2-032
Fig. 30
19.7 Multi-Metering System mounting kit for
the harrow of the GK 250/300 M1
(Please note that the Multi-Metering System must be mounted in
compliance with ISO 4254-1.)
Items included:
1 counter plate, installation material
Order number:
06008-2-031
Fig. 31
19.8 Multi-Metering System mounting kit for
the roller of the GK 250/300 M1
(Please note that the Multi-Metering System must be mounted in
compliance with ISO 4254-1.)
Items included:
2nd support for the roller, MD bracket, installation material
Order number:
06008-2-014
Fig. 32
19.9 Front mounting for the harrow of the GK
Items included:
2 steered feeler wheels, feeler wheel bracket, CAT 2-1 lower link
pin, CAT 2 top link (max. length 1730 mm), installation material
Order number:
06008-2-021
Fig. 33