background image

2016/11/24

REV1.2 Quick Installation Guide

1

APsystems YC1000-3-ZA Microinverter Quick Installation Guide

The sketch of YC1000-3 support system.

All the solar panels are placed into two lines. Then put a YC1000-3 in the middle of the two lines and make
sure it is easy to connect with to four panels which are next to it, as well all the cables.

Step 1. Verify the grid voltage to match with microinverter rating.
Step 2. Lay the AC bus according to the arrangement of APsystems Microinverter.
Step 3. Attach the APsystems Microinverters to the racking.

Step 4. Attach the antenna to the microinverter, and keep the antenna vertical to the
earth.

Step 5. Connect the APsystems Microinverter cables to the AC bus cable.

NOTE: AC connector interface as follows,

NOTE: Cover all unused T connectors with

from left to right PE, N, L3, L2, L1.

sealing caps to protect the T connectors.

Reviews: