COOLING SYSTEM
5
- 10
RSV mille
2%-/6).' 4(% 4(%2-!, %80!.3)/.
6!,6%
Carefully read 0.5.1 (PRECAUTIONS AND GENERAL
INFORMATIONS) and 1.2.5 (COOLANT).
◆
Drain the cooling circuit completely, see 2.16 (CHANG-
ING THE COOLANT).
NOTE
Have the appropriate special tool
m
to hand:
–
aprilia
part# 0277295 (hose clamp installation pliers).
a
CAUTION
Upon installation, replace the hose clamp that has
been removed with a new one having the same di-
mensions, see 0.4.2 (SPARE PARTS CATALOGUES).
Do not attempt to reinstall the removed hose clamp,
since it is unusable.
Do not replace the removed hose clamp with a screw
clamp or with other types of clamp.
◆
Release the hose clamp (1).
◆
Pull the pipe (2) off the thermal expansion valve (3).
Clamps driving torque (4) (5): 7 Nm (0.7 kgm).
◆
Loosen the clamps (4) (5).
◆
Grip the thermal expansion valve (3) and pull it free of
the two couplings (6) (7) one small step at a time.
a
CAUTION
Plug the coupling openings, in such a way as to pre-
vent any foreign matters from getting in.
5.6.1 CHECKING THE THERMAL EXPANSION
VALVE
Carefully read 0.5.1 (PRECAUTIONS AND GENERAL
INFORMATIONS) and 1.2.5 (COOLANT).
◆
Remove the thermal expansion valve, see 5.6 (RE-
MOVING THE THERMAL EXPANSION VALVE).
◆
Check the heat-sensitive wax for signs of cracking or
excessive wear: in this case, replace the whole valve
(3).
Check the valve (3) is working properly as follows:
◆
Tie a piece of string around the valve (3).
◆
Place a container (8) holding coolant on a burner (9).
◆
Immerse the valve (3) in the container.
NOTE
The valve (3) must be fully submersed without
allowing it to touch the walls or bottom of the container (8).
◆
Secure the string so that the valve (3) remains in place.
◆
Heat the coolant, using a thermometer (10) with a 0 –
150 °C (32 – 302 °F) range to check the rise in temper-
ature.
Follow
ã
Release 00/2002-10
- 00
Summary of Contents for RSV MILLE
Page 1: ......
Page 12: ...RSV mille 1 1 GENERAL INFORMATION 1 Release 00 2002 10 00 ...
Page 27: ...GENERAL INFORMATION 1 16 RSV mille 1 7 4 ENGINE TOOLS Release 00 2002 10 00 ...
Page 29: ...GENERAL INFORMATION 1 18 RSV mille 1 7 5 MISCELLANEOUS TOOLS Release 00 2002 10 00 ...
Page 50: ...RSV mille 2 1 1 SERVICE AND SETTING UP 2 Release 00 2002 10 00 ...
Page 116: ...3 1 RSV mille 1 3 ENGINE 3 Release 00 2002 10 00 ...
Page 138: ...4 1 RSV mille 1 2 3 FUEL SUPPLY SYSTEM 4 Release 00 2002 10 00 ...
Page 168: ...RSV mille 5 1 1 2 3 4 COOLING SYSTEM 5 Release 00 2002 10 00 ...
Page 182: ...RSV mille 6 1 1 2 3 4 5 ELECTRIC SYSTEM 6 Release 00 2002 10 00 ...
Page 185: ...6 4 ELECTRIC SYSTEM RSV mille 42 0 43 9 54 00 Release 00 2002 10 ...
Page 231: ...6 50 ELECTRIC SYSTEM RSV mille 7 2 2 236 MILLE Release 00 2002 10 00 ...
Page 233: ...6 52 ELECTRIC SYSTEM RSV mille 7 2 2 236 MILLE e Release 00 2002 10 00 ...
Page 236: ...RSV mille 7 1 1 2 3 4 5 6 CHASSIS 7 Release 00 2002 10 00 ...
Page 350: ...1 2 3 4 5 6 7 RSV mille 8 1 1 2 3 4 5 6 7 REPAIR INFORMATION 8 Release 00 2002 10 00 ...
Page 359: ...8 10 RSV mille 8 2 3 FUEL SYSTEM PIPES Release 00 2002 10 00 ...
Page 361: ...8 12 RSV mille 8 2 6 COOLING SYSTEM PIPES Follow ã Release 00 2002 10 00 ...
Page 362: ...RSV mille 8 13 Follow ã Release 00 2002 10 00 ...
Page 363: ...8 14 RSV mille 8 2 7 ENGINE OIL PIPES Release 00 2002 10 00 ...
Page 364: ...RSV mille 8 15 8 2 8 BREATHER AND IMPURITY DRAINAGE PIPES Release 00 2002 10 00 ...
Page 365: ...8 16 RSV mille 8 2 9 ACCELERATOR CONTROL CABLES 8 2 10 COLD START CABLE Release 00 2002 10 00 ...
Page 369: ...8 20 RSV mille Follow ã Follow ã Release 00 2002 10 00 ...
Page 370: ...RSV mille 8 21 Follow ã Release 00 2002 10 00 ...
Page 374: ... 1 RSV mille 0 1 2 3 4 5 6 7 8 ANALYTICAL INDEX Release 00 2002 10 00 ...
Page 386: ......