Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|9

 

  

Figure 1 Apricus Storage Tank 

All  ports  on  an  Apricus  Australia  storage  tank  are  of 
20mm (3/4”) BSP. Teflon tape must be used to seal any 
fitting. Copper olives must be used with all compression 
fittings.  

IMPORTANT 

Apricus  tanks  must  be  installed  in  accordance  to 
AS/NZS  3500.4  as  well  as  any  other  relevant 
local/government standards. 

5.3.1.1 INLET (MAINS) 
The  mains  line  should  consist  of  the  following  brass 
components when installing: 

 

Duo valve 

 

Cold Water ECV 

 

Pressure Reducing Valve 

 

Four-Way Cross 

 

Figure 2 Mains Line Valves 

The set of mains line valves can be purchased as a kit from 
Apricus  and  provides  the  above  components  with 
insulating jackets to streamline the installation process. 

IMPORTANT 

The  tempering  valve  must  be  the  last  downstream 
component installed before the hot water reaches the 
house.   

5.3.1.2 SOLAR FLOW 

IMPORTANT 

Cap  this  port  with  brass  plugs  supplied  when  solar 
collectors are not being installed. 

 
When solar domestic hot water system is set up, this port 
is  used  for  the  water  line  directed  up  to  the  solar 
collectors to be heated. This line consists of the following 
components in order from closest to furthest away from 
the solar flow port: 

 

Circulation Pump 

 

Flow meter  

 

Check valve 

 

Collectors 

Summary of Contents for AP250GLE

Page 1: ...Issue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 1 Apricus Solar Hot Water Installation Manual For Electric Hot Water Tanks Solar Ready...

Page 2: ..._SRT AA 2 CONTENTS CHAPTER 1 INTRODUCTION 3 CHAPTER 2 WARNINGS AND PRECAUTIONS 4 CHAPTER 3 SITE INSPECTION 6 CHAPTER 4 COMPONENT INSPECTION 7 CHAPTER 5 SYSTEM PLUMBING 8 CHAPTER 6 COMMISSIONING 11 CHA...

Page 3: ...d Tube functions to harness the solar energy by capturing and retaining the heat due to the presence of the vacuum Flow Line The plumbing line running from tank solar flow port to the inlet of the col...

Page 4: ...ROL Where the mains supply pressure can exceed or fluctuate beyond the pressure of 500kPa a pressure limiting valve must be fitted to the cold mains line The device is installed after the duo valve is...

Page 5: ...ery important that the auxiliary boosting system remains on It will only activate if the temperature falls below the temperatures outlined 2 5 EHW TANK 2 5 1 HYDROGEN BUILD UP Glass lined vitreous ena...

Page 6: ...For glass lined tanks consider the positioning of the tank to allow room for anode removal and replacement maintenance The storage tank must be installed in a properly drained safe tray where leakage...

Page 7: ...an electric element Ensure the tank has two brass plugs 4 2 NECESSARY COMPONENTS Ensure that the following components have been sourced for the installation These are not provided as a standard with t...

Page 8: ...ATERIAL AND PIPE SIZE For domestic installations the recommended pipe is copper and the size is Two factors affect the choice of pipe sizing the flow rate and pressure drop These two factors are close...

Page 9: ...ECV Pressure Reducing Valve Four Way Cross Figure 2 Mains Line Valves The set of mains line valves can be purchased as a kit from Apricus and provides the above components with insulating jackets to...

Page 10: ...extracted to be supplied to the household 5 3 1 5 SENSOR PORTS When solar DHW system is set up the sensors must be coated with heat transfer paste and inserted through the cable gland into the approp...

Page 11: ...er all the plumbing connections have been made EHW tank needs to be filled with water and purged of air To fill the system 1 Open the cold mains line and fill up the tank and open the hot water outlet...

Page 12: ...he electrical element will be required to be directly connected to a 240V AC 50Hz mains power supply Flexible conduit is required to enclose any exposed electrical cables to the storage unit 7 2 2 THE...

Page 13: ...us EHW tank ensure that each of the following processes is carried out prior to leaving the site 8 1 CHECKLIST PRIOR TO LEAVING INSTALLATION SITE EHW tank check Check all connections for leaks and tha...

Page 14: ...sue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 14 CHAPTER 9 APPENDIX 7 1 3 6 5 4 2 Figure 4 Typical Electric boosted solar hot water syste...

Page 15: ...or adverse water conditions including excessive water pressure or temperature neglect of any kind or otherwise as a result of any use of the Unit contrary to the product manual or other instructions p...

Page 16: ...annot be excluded under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage You are als...

Reviews: