Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
40
Install the Quilt Top Roller & Quilt Backing Roller
1.
Locate both the Quilt Top & Quilt Backing Rollers and perform these steps for each roller:
2.
Rest the roller’s threaded end on the floor. Take note of each of the roller’s placement in the image
below.
3.
Insert both the Quilt Top and Backing Rollers shaft ends into the right leg’s ball joint as shown in the
following image.
4.
On the left side of the table, raise the left side of the roller and install the shoulder bolt and collar as
with the previous two rollers that you have already installed.