Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
18
Install the Cross Tubes
Tools
½’’ Open-End Wrench
Cross Tube Box Contents
Required: ½’’ Socket Wrench
Open the Carriage Box 4 and unpack the Cross Tube Box and Hardware. You will need the cross tubes,
serrated bolts and spacers for this step. You will only need 10 bolts and spacers – we have included an extra
bolt and spacer. Set the felt dots and bumpers aside for now.
NOTE: Ignore the labels on the cross tubes; our vendor uses that information to package the tubes for APQS.
The 5 cross tubes keep the rails parallel and support the pantograph table top. Install the cross tubes to the
rear table rail as shown in the next steps.