Portable Test Equipment
User’s Guide
www.appliedp.com
PTE-UGFW56a-EN
111
7.4 Measurement Time
Measurement Time (time needed for new sample) is defined by Integration Time, which is stated in
Test Settings of device.
If time between marks / impulses from the meter under test is longer than Integration Time then
Measurement Time is equal to time between capturing marks from the meter.
7.5 Measurement Error
Measurement Error Limits (tolerances of precision) in basic load points and temperature 23
°C are
defined in technical specification. Measurement Error Limit for power measurement in other load
points and temperatures is:
TEMP
PHASE
AMPL
DEV
LIMIT
LIMIT
LIMIT
LIMIT
2
2
LIMIT
DEV
............... overall device error [in %]
LIMIT
AMPL
............. amplitude error [in %]
(defined in technical specification)
LIMIT
PHASE
............ phase error [in %]
LIMIT
TEMP
............. temperature error [in %]
Calculation of phase error for active power:
PHASEDEG
PHASE
LIMIT
K
tg
LIMIT
)
(
100
Calculation of phase error for reactive power:
PHASEDEG
PHASE
LIMIT
K
g
LIMIT
)
(
cot
100
Calculation of temperature error:
TC
T
T
LIMIT
SPEC
TEMP
K
.......................... conversion constant (to radians):
0175
.
0
180
K
φ
..........................
phase angle between voltage and current [°]
LIMIT
PHASEDEG
....... phase error [in %]
(defined in technical specification)
T
.......................... temperature at measurement
T
SPEC
.................... temperature defined in technical specification:
T
SPEC
=23
˚C
TC
........................ temperature coefficient of the device:
TC= 0.005 %/˚C ........... for PTE 2x00