![Applied Biosystems 7300 Installation And Maintenance Manual Download Page 94](http://html.mh-extra.com/html/applied-biosystems/7300/7300_installation-and-maintenance-manual_2955104094.webp)
Chapter 6
Performing the Pure Dye Calibration
Overview
68
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Notes
Overview
Note:
You can also use the Real-Time System Setup wizard
to perform the procedure in
this chapter. To access the wizard, select
Program Files 7300/7500/7500
Fast System
Real-Time System Setup Wizard
.
Time Required
•
7300 systems:
45 minutes
•
7500/7500 Fast systems:
1 hour
Materials
Required
When to Perform
Pure Dye
Calibrations
Perform a pure dye calibration:
• When installing the system (you must perform all calibrations in this order: ROI
background optical (7500/7500 Fast systems only) pure dye instrument
verification).
• Every 6 months, depending on instrument use.
IMPORTANT!
You must perform a background run before every pure dye calibration.
Because the age and use of instrument components can affect pure spectra readings,
Applied Biosystems recommends performing a pure dye calibration at least every six
months.
Safety
Glasses
Powder-free
Gloves
Pure Dye Plates
(FAM
™
, JOE
™
, NED
™
,
ROX
™
, SYBR
®
Green,
TAMRA,
™
and VIC
®
dyes)
Pure Dye Plates
(CY3, CY5, and
TEXAS RED
®
dyes)
7300, 7500/7500
Fast system
7500/7500 Fast
system only
Applied Biosystems
Real-Time PCR System
Spectral Calibration Kit
GR2170
Centrifuge with plate
adapter
Summary of Contents for 7300
Page 173: ......