AOBO ENVIRONMENTAL NEW ENERGY (WUXI) CO., LTD.
Add: Industrial Concentration zone, Sumiao village, Qianqiao street Huishan District, Wuxi city, Jiangsu province, China
Tel: +86-510-83209451 Fax: +86-510-83203470
Web: http://www.aoboet.com.au E-mail: [email protected]
- 12 -
NOTICE
Make sure that the cross-sectional area of charging cables is 25 to 35 mm
2
.
NOTICE
A bipolar breaker between AOBOET battery and inverter was required to install, and
the breaker’s min. current should be over 150A or following with local regulations.
4.5
Tools
To install the battery pack, those following tools are required:
Phillips screwdriver
Torque wrench
Cable crimper
Wire clamp
Voltmeter
Tape measure
Drill
Flat-head screwdriver
In order to protect operator and installer’s safety, please select and use suitable tools
and measuring instruments that are certified for precision and accuracy.
4.6
Safety instruments
When dealing with the battery, following safety gears should be equipped. Installers
must meet the relevant requirements of IEC 60364 or the domestic legislation and
other relevant international standards.
Insulated glove
Safety goggles
Safety shoes
4.7
Making network cable
The network cable between AOBOET battery and inverter should be made like that
diagram. If available, use a LAN cable tester to see whether the cable is faulty.
4.8
Storage
If the battery is not to be installed immediately, or removed from operation and needs
to be stored for a long period, please choose an appropriate location to store it.
Instructions for storage are:
-
Do not stack more than four battery boxes.