![Anywave ATSC 1KW Quick Start Manual Download Page 14](http://html1.mh-extra.com/html/anywave/atsc-1kw/atsc-1kw_quick-start-manual_2949028014.webp)
ATSC 1KW TX Quick Start Guide
ACT-1000-QSG-DOC-V1.6, 9/12/2014
Page 14 of 23
8
AC Mains Connections
Please review the safety WARNINGS on page 4 of this manual before proceeding
with any electrical work.
A licensed Electrician is required to properly and safely connect the 220V power
cable from your stations electrical panel to the terminal block located inside the TX AC
Mains Distribution compartment in compliance with local electrical and building codes.
Please note: a power cable is not provided with the Transmitter system and should be
obtained via your local Electrician.
Be sure the Main Breaker on the lower left front of the TX is turned OFF before
performing any electrical work on the TX (as shown below).
Main Breaker OFF