4 Installation
D52IB001EN-G
21
4 Installation
This chapter describes the installation of TTK 600 on the X-ray diffractometer.
4.1 Installation Overview
The following schematic diagrams show how to set up TTK 600 with liquid nitrogen cooling equipment and
with compressed-air cooling equipment. The connectors referenced with numbers are described in the in-
stallation requirements following the schematic diagrams.
Fig. 24: Installation diagram for TTK 600 with liquid nitrogen cooling equipment.
CCU 100
rear panel
POWER
RS 232
AIR
OUT
1
AIR
IN
LAN
Sensors
Heater
Heater
Out 1
Out 2
Flow
Sensor
Low Power
Module
LN2
VESSEL
LN2
⇒
֚
Gas e
xhaus
t
sy
st
em
TTK 600
SAMPLE
CHAMBER
L=5m
L=3.5m
Ø 4cm
water out
⇒
P
⇐
water in
DIFFRACTOMETER CABINET
L=3.5m
Ø 4cm
6
4
3
WATER FLOW
MONITOR
2 bar
L=3m
PRESSURE
REGULATOR
max. 8 bar
PC
2
LN2
Evaporation
Box
Venturi
Nozzle
Air/N2
AIR DRYER
(optional)
5
AIR SERVICE UNIT
P
⇐
compressed-air in
max. 8 bar
min. 6 bar
max. 8 bar
Summary of Contents for TTK 600
Page 2: ......
Page 74: ...Appendix B Sample Chamber Dimensions 74 D52IB001EN G Appendix B Sample Chamber Dimensions ...
Page 75: ...Appendix C Declaration of Conformity D52IB001EN G 75 Appendix C Declaration of Conformity ...
Page 77: ...Appendix D Spare Parts and Accessories D52IB001EN G 77 176383 COOLING MODE SWITCHING VALVE ...