background image

Power Input Wiring 

Please follow the steps below to insert the power wire: 

1.  Insert the positive and negative wires into the 

PWR1 

(V1+, V1-) 

and 

PWR2 (V2+, V2-) 

contacts on the 

terminal block connector as shown below in 

Figure 1

2.  Tighten the wire-clamp screws to prevent the wires from 

loosening, as shown below in 

Figure 2

 

 

 

4.  Use the hook holes at the corners of the 

wall mounting bracket to hang the 
industrial Ethernet switch on the wall. 

5.  To remove the wall mount bracket, do the 

opposite from the steps above. 

 
 
 
 
 
 
 

 

Field Maintenance and Service 

 

 

Figure 6 

Warranty Policy 

Warranty Conditions

 

Products supplied by Antaira Technologies are covered in this 
warranty for sub-standard performance or defective 
workmanship. The warranty is not, however, extended to goods 
damaged in the following circumstances: 
(a)  Excessive forces or impacts 
(b)  War or an Act of God: wind storm, fire, flood, electric shock, 

earthquake 

(c)  Use of unqualified power supply, connectors, or 

unauthorized parts/kits 

(d)  Replacement with unauthorized parts 

RMA and Shipping Costs Reimbursement

 

Figure 1 

Figure 2 

 

Industrial Switch Mounting 

DIN-Rail Mounting 

The DIN-Rail bracket is pre-installed on 
the industrial Ethernet switch from the 
factory. Please refer to 

Figure 3 

for a 

DIN-Rail bracket installation reference. 
Follow the steps below for installing the 
industrial switch on the DIN-Rail track: 
1.  Insert the top of the DIN-Rail on to the 

track as shown below in 

Figure 4. 

2.  Lightly pull down the bracket on to the 

rail as shown below in 

Figure 5. 

3.  Check if the bracket is mounted 

tightly on the rail. 

4.  To remove the industrial Ethernet switch 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 3 

 

If  the  device  requires  servicing  of  any  kind,  the  user  is 
required to disconnect and remove it from its mounting. The 
initial installation should be done in a way that makes this as 
convenient as possible. 

 

Voltage/power lines should be properly insulated as well as 
other cables. Be careful when handling them so as to not trip 
over. 

 

Do not under any circumstance insert foreign objects of any 
kind  into  the  heat  dissipation  holes  located  in  the  different 
faces  of  the  device.  This  may  not  only  harm  the  internal 
layout, but might cause harm to user as well. 

 

Do  not  under  any  circumstance  open  the  device  for  any 
reason. Please contact your dealer for any repair needed or 
follow the instructions within the manual. 

Customers shall always obtain an authorized "RMA" number 
from Antaira before shipping the goods for repair or 
replacement. 

 

Within the warranty period (based on the invoice date), all 
parts and labor are free of charge to the customers.

 

  Customers are responsible for the cost of parts and labor, if 

the products are out of warranty.

 

 

For RMA service, customers are responsible for the shipping 
expense for shipping the RMA unit(s) to Antaira. Antaira is 
responsible for the shipping expense via a ground service 
for the return repair/replace unit(s) back to customers.

 

 

Limited Liability

 

Antaira would not be held responsible for any consequential 
losses from using 

Antaira’s product. 

 

Warranty Period

 

from the rail, do the opposite from the steps above. 

5-Year Warranty 

 
 
 
 

 

 

 

Wall Mounting 

 

Figure 5 

Antaira’s Customer Service and Support 

 

Antaira’s Technical Service & Support Centers: 

+ 844-268-2472 

(Antaira US Headquarter) 

+ 48-22-862-88-81  (Antaira Europe Office) 

Follow the steps below to mount the industrial Ethernet switch 
using the wall mounting bracket as shown below in 

Figure 6

 

1.  Remove the DIN-Rail bracket from the industrial Ethernet 

switch by loosening the screws. 

2.  Place the wall mounting brackets on the top and bottom of 

the industrial Ethernet switch. 

3.  Use the screws to screw the wall mounting bracket on the 

industrial Ethernet switch. 

+ 886-2-2218-9733    (Antaira Asia Office) 

 

 

Antaira’s Web Sites & Repair/Support Emails:

 

www.antaira.com 

/

 [email protected] 

www.antaira.eu 

[email protected] 

www.antaira.com.tw 

/ 

[email protected]

 

 

 

*Any changes will be announced on the Antaira website. 

Figure 4 

Reviews: