Power Input Wiring
Please follow the steps below to insert the power wire:
1. Insert the positive and negative wires into the
PWR1
(V1+, V1-)
and
PWR2 (V2+, V2-)
contacts on the
terminal block connector as shown below in
Figure 1
.
2. Tighten the wire-clamp screws to prevent the wires from
loosening, as shown below in
Figure 2
.
4. Use the hook holes at the corners of the
wall mounting bracket to hang the
industrial Ethernet switch on the wall.
5. To remove the wall mount bracket, do the
opposite from the steps above.
Field Maintenance and Service
Figure 6
Warranty Policy
Warranty Conditions
Products supplied by Antaira Technologies are covered in this
warranty for sub-standard performance or defective
workmanship. The warranty is not, however, extended to goods
damaged in the following circumstances:
(a) Excessive forces or impacts
(b) War or an Act of God: wind storm, fire, flood, electric shock,
earthquake
(c) Use of unqualified power supply, connectors, or
unauthorized parts/kits
(d) Replacement with unauthorized parts
RMA and Shipping Costs Reimbursement
Figure 1
Figure 2
Industrial Switch Mounting
DIN-Rail Mounting
The DIN-Rail bracket is pre-installed on
the industrial Ethernet switch from the
factory. Please refer to
Figure 3
for a
DIN-Rail bracket installation reference.
Follow the steps below for installing the
industrial switch on the DIN-Rail track:
1. Insert the top of the DIN-Rail on to the
track as shown below in
Figure 4.
2. Lightly pull down the bracket on to the
rail as shown below in
Figure 5.
3. Check if the bracket is mounted
tightly on the rail.
4. To remove the industrial Ethernet switch
Figure 3
⚫
If the device requires servicing of any kind, the user is
required to disconnect and remove it from its mounting. The
initial installation should be done in a way that makes this as
convenient as possible.
⚫
Voltage/power lines should be properly insulated as well as
other cables. Be careful when handling them so as to not trip
over.
⚫
Do not under any circumstance insert foreign objects of any
kind into the heat dissipation holes located in the different
faces of the device. This may not only harm the internal
layout, but might cause harm to user as well.
⚫
Do not under any circumstance open the device for any
reason. Please contact your dealer for any repair needed or
follow the instructions within the manual.
Customers shall always obtain an authorized "RMA" number
from Antaira before shipping the goods for repair or
replacement.
•
Within the warranty period (based on the invoice date), all
parts and labor are free of charge to the customers.
•
Customers are responsible for the cost of parts and labor, if
the products are out of warranty.
•
For RMA service, customers are responsible for the shipping
expense for shipping the RMA unit(s) to Antaira. Antaira is
responsible for the shipping expense via a ground service
for the return repair/replace unit(s) back to customers.
Limited Liability
Antaira would not be held responsible for any consequential
losses from using
Antaira’s product.
Warranty Period
from the rail, do the opposite from the steps above.
5-Year Warranty
Wall Mounting
Figure 5
Antaira’s Customer Service and Support
•
Antaira’s Technical Service & Support Centers:
+ 844-268-2472
(Antaira US Headquarter)
+ 48-22-862-88-81 (Antaira Europe Office)
Follow the steps below to mount the industrial Ethernet switch
using the wall mounting bracket as shown below in
Figure 6
.
1. Remove the DIN-Rail bracket from the industrial Ethernet
switch by loosening the screws.
2. Place the wall mounting brackets on the top and bottom of
the industrial Ethernet switch.
3. Use the screws to screw the wall mounting bracket on the
industrial Ethernet switch.
+ 886-2-2218-9733 (Antaira Asia Office)
•
Antaira’s Web Sites & Repair/Support Emails:
*Any changes will be announced on the Antaira website.
Figure 4