General Information
1-9 Battery Replacement
BTS Master UG
PN: 10580-00207 Rev. E
1-5
1-9
Battery Replacement
The battery can be replaced without the use of tools. The battery compartment is located on
the lower left side of the instrument (when you are facing the measurement display). Slide
the battery door down, towards the bottom of the instrument, to remove it. Remove the
battery pack from the instrument by pulling straight out on the battery lanyard. Replacement
is the opposite of removal.
The battery that is supplied with the BTS Master may need charging before use. The battery
can be charged while it is installed in the BTS Master by using either the AC-DC Adapter or
the 12-Volt DC adapter, or separately in the optional Dual Battery Charger. Refer to your
Technical Data Sheet for Anritsu part numbers. Refer to section
for a description of battery symbols.
Figure 1-1.
Battery Compartment Door
Note
Use only Anritsu approved batteries, adapters, and chargers with this instrument.
Caution
When using the Automotive Cigarette Lighter 12 VDC Adapter, always verify that
the supply is rated for a minimum of 60 Watts @ 12 VDC, and that the socket is
clear of any dirt or debris. If the adapter plug becomes hot to the touch during
operation, then discontinue use immediately.
Note
Anritsu Company recommends removing the battery for long-term storage of the
instrument.
Summary of Contents for BTS Master MT8221B
Page 1: ...BTS Master User Guide MT8221B and MT8222B The High Performance Handheld Base Station Analyzer ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 24: ...1 12 Secure Environment Workplace General Information 1 10 PN 10580 00207 Rev E BTS Master UG ...
Page 46: ...2 13 Firmware Overview Instrument Overview 2 22 PN 10580 00207 Rev E BTS Master UG ...
Page 54: ...3 8 PN 10580 00207 Rev E BTS Master UG ...
Page 88: ...7 8 PN 10580 00207 Rev E BTS Master UG ...
Page 94: ...8 5 Updating Instrument Firmware Master Software Tools 8 6 PN 10580 00207 Rev E BTS Master UG ...
Page 95: ...Master Software Tools 8 5 Updating Instrument Firmware BTS Master UG PN 10580 00207 Rev E 8 7 ...
Page 96: ...8 5 Updating Instrument Firmware Master Software Tools 8 8 PN 10580 00207 Rev E BTS Master UG ...
Page 97: ...Master Software Tools 8 5 Updating Instrument Firmware BTS Master UG PN 10580 00207 Rev E 8 9 ...
Page 114: ...C 8 PN 10580 00207 Rev E BTS Master UG ...
Page 118: ...Index 4 PN 10580 00207 Rev E BTS Master UG ...
Page 152: ...2 18 Other Menus GSM GPRS EDGE Signal Analyzer 2 18 PN 10580 00234 Rev V 3GPP MG ...
Page 196: ...3 18 Other Menus W CDMA HSPA Signal Analyzer 3 44 PN 10580 00234 Rev V 3GPP MG ...
Page 224: ...4 16 Other Menus TD SCDMA HSPA Signal Analyzer 4 28 PN 10580 00234 Rev V 3GPP MG ...
Page 272: ...5 19 Other Menus LTE Signal Analyzer 5 48 PN 10580 00234 Rev V 3GPP MG ...
Page 338: ...7 5 Coverage Mapping Menu LTE and TD LTE Coverage Mapping 7 16 PN 10580 00234 Rev V 3GPP MG ...
Page 354: ...8 4 W CDMA EMF Menu EMF Option 444 8 16 PN 10580 00234 Rev V 3GPP MG ...
Page 360: ...Index 4 PN 10580 00234 Rev V 3GPP MG ...
Page 361: ......