
Chapter 2 Before Use
2-20
2.9 Turning Power On/Off
2.9.1 Power-on
1. Connect the power cord plug, referring to Section 2.3 “Power
Connection”.
The BERTWave enters the standby state and the power switch lamp
lights orange.
2. Press the power switch.
The power lamp lights green and the Windows start-up begins.
3. In 30 seconds, the selector screen is displayed.
Figure 2.9.1-1 Selector Screen
Notes:
If no button on the selector screen is touched within 15 s, the
[Main Application] is executed by default.
Do not press the power switch while the start-up screen is
displayed, otherwise the BERTWave Control software may not
start normally.
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...