
Chapter 9 Performance Test
9-12
ED2 can be tested in the same way with the Option 012. The connection
diagram is as follows.
PPG1 Data Out
Ch A In
Coaxial Terminator
Coaxial Terminator
Fixed Attenuator
PPG1 Data Out
ED2 Data In Coaxial
Terminator
Coaxial Terminator
Fixed Attenuator
(b) Input Level Measurement
(a) Amplitude Check
Figure 9.2.2-3 ED2 Data In Input Sensitivity Test Connection Diagram
PPG1 Data Out
Ch A In
Coaxial Terminator
Fixed Attenuator
Coaxial Terminator
PPG1 Data Out
ED2 Data In
Coaxial Terminator
Fixed Attenuator
Coaxial Terminator
(b) Input Level Measurement
(a) Amplitude Check
Figure 9.2.2-4 ED2
Data
In Input Sensitivity Test Connection Diagram
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...