
S312D MM
PN: 10580-00195 Revision B
2-1
Chapter 2 — Performance Verification
2-1
Performance Verification
The following sections contain tests that can be used to verify the performance of the Site Master S312D.
Before performing any of the tests in these sections, ensure that the S312D has had a minimum of 30 minutes
warm up and that the test equipment has been warmed up to the specifications of its manufacturer.
“Required Equipment for Performance Verification” on page 1-2
lists the required equipment for performance
verification.
Note
Anritsu Company recommends that you use an AC/DC power adapter during performance
verification of the S312D.
Summary of Contents for Site Master S312D
Page 2: ......
Page 10: ...1 4 Replaceable Parts General Information 1 4 PN 10580 00195 Revision B S312D MM ...
Page 48: ...3 7 RTC Battery Information Removal and Replacement 3 8 PN 10580 00195 Revision B S312D MM ...
Page 58: ...Test Records A 10 PN 10580 00195 Revision B S312D MM ...
Page 60: ...Test Fixture Schematics B 2 PN 10580 00195 Revision B S312D MM ...
Page 61: ......