Blades Assembly 

To assemble the blades, it is necessary to screw the plastic end caps, and introduce and fix them to the motor 
guides. Use the M6 bolts to fix the plastic end caps before lifting the blade to the motor.  

 

 
10.  Insert  the  end-cap  into  the  blade 
and  tighten  with  the  7  bolt  kits  as 
picture shown. 
Please.  Process  this  step  on  the 
ground. 
 
Recommended  Tightening  Torque: 
5Nm. 
 
 

Use End-Caps Bolt Kit (7 x M6*45)

 
 

 

Once the end caps are screwed, remove the plastic protection film and proceed to lift the blade to the motor. Take 
care  to  avoid  any  damage  on  the  blades  paint.  The  fan  blades  must  be  installed  in  a  specific  sense,  with  the 
concave side in the bottom. 

 

 
11-1.  Insert  the  blade  into  the  blade 
guide  and  tighten  it.  Recommended 
tightening torque: 12Nm  
 
11-2.  Place  retainer  over  the  blade 
and spans to the other blade. 
 
Use 

Blades Bolt Kit (21 x M8*45).

 

 

CAUTION! 

 

Make sure the blades are installed in the correct sense.

 Failure to do so may result in incorrect installation. 

 
 

Tighten the outside bolts first and then the inside bolts with the blades’ retainer.

 Failure to do so may 

result in incorrect installation. 
 
 

Check that there are no objects that can avoid the blades rotation.

 Failure to do so may result in equipment 

damage. 
 

Retainer 

Summary of Contents for AIRPRO 400 L

Page 1: ...AIRPRO L Installation Manual Issued March 2020 ANIM19AI Rev A...

Page 2: ...O L 2 UPDATES DATE UPDATE DESCRIPTION 05 03 2020 A First Edition Technical documents are regularly updated Anemoi reserves the right to modify the contents of this manual in full or in part without wa...

Page 3: ...ion Tools 13 5 3 I Beam Conditions 13 5 4 Pre installation Checklist 14 5 5 Blade guide 14 5 6 Ceiling Mount Bracket 15 5 7 Safety Cable Installation 16 5 8 Extension Tube Shield Installation 17 5 9 G...

Page 4: ...rious injury or death Do NOT use wires with worn or damaged insulation Doing so may result in serious or fatal electrical shock fire or other accidents Ensure that the wires are held securely and prot...

Page 5: ...built in seven blades and the drives are provided in an external box to reduce maintenance and installation costs The main characteristics are EC brushless motor without gearbox 184mm ultra thin moto...

Page 6: ...65rpm 60rpm 50rpm Protection degree IP55 IP55 IP55 IP55 IP55 Sound level 46dBA 46dBA 46dBA 46dBA 46dBA Total weight 90kg 100kg 104kg 110kg 120kg Operation temperature 10 C 40 C without derating Motor...

Page 7: ...an can also be varied by changing the length of the extension rod The next figure shows the fan dimensions with an extension drop of 643 mm Model D A B H1 H2 H3 AIRPRO 400 L 4 0 m 420 mm 250 mm 573 mm...

Page 8: ...AIRPRO L Motor 1350 507 650 49 Blades 3526 305 225 32 4 2 Packing List The following tables include the different pieces sent inside the boxes Please check the status and quantity of the fan equipment...

Page 9: ...End Caps 7 pcs 4 Turnbuckle 4 pcs 5 Beam clamp set 4 pcs 6 Earth Wire 1 pc 7 Blades Retainer 7 pcs BOLTS Connecting with Screw standard QTY Blade Guides on motor M10 Flat washer 14 M10 Spring washer 1...

Page 10: ...fety Cable B I Beam clamp C I Beam shim D Mounting Base E Mounting bracket F Extension tube G Extension tube shield H Extension tube clamp I Wire rope clamp J Blades Retainer K Main Fan Unit motor L B...

Page 11: ...revent anyone from going under the fan It is recommended to fence at least four meters around the lifting equipment Follow any national or local regulation regarding installations in height SAFETY Ens...

Page 12: ...necessary to avoid the strobe effect Ensure that the fan is installed at a height greater than 3 05 meters The next figures show all clearances If the fan is installed in an inclined roof ensure that...

Page 13: ...10 Electronic level 1 5 3 I Beam Conditions In case of I Beam installation make sure the minimums requirements are met Please consult with structural engineer to make sure your building is approved f...

Page 14: ...blades should be at least 3 05 meters above the ground Please refer to section 5 1 Clearances For the fan installation the distance between the blades and other objects building structure should be at...

Page 15: ...ounting Base Bolt Kit 4 x M12 60 3 1 Slide the motor main fan unit to the Mounting Base hanger the Mounting Bracket and securely fasten 3 2 Ensure the nuts on the hanger is tightened Recommended tight...

Page 16: ...ned as picture shows make sure the U shaped inside the wire rope clamp is tighten to the short side Recommended Tightening Torque 12Nm Use 4 x Wire Rope Clamp and 1 x Safety Cable If the fan is anchor...

Page 17: ...6 16 and 1 x Earth Wire 5 3 Fix the extension tube shied with bolts after fasten all the safety cables and wires Recommended tightening torque 5Nm Be careful by installing so do not damage the wiring...

Page 18: ...from the bottom of ceiling fan the angle between each cables and I beams is recommended to be 45 degrees 6 3 The angle of the cables should be and 45 degrees angle from horizontal surface 7 1 Prepare...

Page 19: ...amp as picture shows 9 2 Adjust the turnbuckle to balance the ceiling fan Recommended Tightening Torque 12Nm Use 8 x Wire Rope Clamp and 4 x Turnbuckle CAUTION Fasten the guy wires clamps correctly to...

Page 20: ...to the motor Take care to avoid any damage on the blades paint The fan blades must be installed in a specific sense with the concave side in the bottom 11 1 Insert the blade into the blade guide and t...

Page 21: ...o a wall Before drilling the wall present the box to the wall and mark the screws Install the control box in a safe area to avoid that it can be damaged WARNING Install the control box in a safe area...

Page 22: ...al regulation regarding electrical installations 6 1 Power and Data Connections The Anemoi Airpro L motor must be connected to the power supply with an electrical voltage of 200 240V I 50 60Hz Please...

Page 23: ...Common for data communication Motor Line U Red U communication for the motor V White V communication for the motor W Black W communication for the motor Power Line Break L Power Supply Line N Power Su...

Page 24: ...Drive Box and to the Extension Tube PE by using the Earth Wire included in the Main Box The connection and installation manual for each control must be consulted WARNING Connect the Ground Line GND t...

Page 25: ...sing control connections The connection must be made in series The next figure shows the correct connections WARNING Never mix electrical and control wiring Doing so may lead to interference The earth...

Page 26: ...ube as shown below 3 Please keep always a distance of at least 20cm between the power and the data cable If both cables must cross at some point please ensure that they do so at a 90 angle to prevent...

Page 27: ...or vibrations Check that the blades have not received any impact Yearly Check that there no alarms or faults in the variable speed drive located in the control box Ensure that the extension rod screws...

Page 28: ...e refer to the following table for quick solutions Observation Probable cause Inspection method Abnormal sound from the fan Blades may not be tightened to the specifies torque Check the tightening tor...

Page 29: ...www anemoifans com...