![Anderson TRB-2000 Diagnostics Manual Download Page 19](http://html1.mh-extra.com/html/anderson/trb-2000/trb-2000_diagnostics-manual_2941745019.webp)
To unload the trailer TRB, it is very important to choose a level ground and
ensure there are no obstacles such as electric power or telephone lines.
Bring the trailer to a complete stop where you want to unload the bales. Turn
the control to raise the platform. Remember that the loading arm must be
lower than 45 ° from the ground so that you can lift the unloading platform.
When the platform is lifted to its maximum position, slowly move forward to
unload the bales on the ground.
When all the bales are unloaded, put the platform in a horizontal position and
the trailer is ready for loading new bales.
If the bales do not slide well, it is likely that the bale guides are improperly
adjusted or the bales stick to the paint. If this is the case, the paint should fade
after 2 or 3 loads.
Unloading of the TRB
PROCEDURE REF# A-TRB-008