2015
35
Packaging,
Transportation
&
Storage
5.3
Transportation
&
Packaging
Instructions
5.3.1
Installation
of
Shipping
Retainers
Overview
Fig.
12: Overview
1
Two-place
carriage
2
Pipetting
head
3
Stacker
B
4
Stacker
A
Placement of shipping brackets/retainers
Prescribed shipping fixtures are duly installed.
1.
Check
that
pipetting
head
is
actually
secured.
2.
Check
that
all
mechanically
moving
parts
are
properly
secured
with
cable
ties,
plastic
foam
pads
or
adhesive
tape.
1
2
3
4
Summary of Contents for 845-00003-03
Page 1: ...InnuPure C96 User Manual ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...2015 VII ...
Page 8: ...VIII 2015 ...
Page 12: ...XII 2015 ...
Page 20: ...8 2015 General Information ...
Page 44: ...32 2015 Technical Description ...
Page 54: ...42 2015 Routine Start Up Procedure ...
Page 60: ...48 2015 Operation ...
Page 64: ...52 2015 What to do if ...
Page 72: ...60 2015 Shutting Down ...
Page 76: ...64 2015 Waste Disposal ...