background image

Installation Guide

CB-MVP-WCS52 

Rough-In Box for MVP-WCS-52 Wall Charging Station

Overview

The CB-MVP-WCS52 Rough-In Box allows the MVP-WCS-52 (5.2" Modero 
ViewPoint Wall Charging Station) to be installed in a solid surface (e.g., wall or 
podium).

Specifications 

WARNING:

 INSTALLER, LEAVE A GAP BETWEEN THE STUD AND 

ROUGH-IN BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK. 
This gap allows the installation of the drywall/sheetrock after the 
CB-MVP-WCS52 has been mounted onto the beams. The stud notching and 
Rough-In Box installation must be done prior to any wall installation.

Note: 

The most important thing to remember when mounting this Rough-In Box 

is that the mounting tabs must be mounted flush against the outside of the 
sheetrock. This step determines whether or not the mounting stud is notched

 

(cutout-out to fit the Rough-In Box).

Installing the CB-MVP-WCS52

The CB-MVP-WCS52 Rough-In Box is 10 inches (25.40cm) wide at its widest 
dimension (wider than the bezel of the Wall Charging Station), and is only 
intended for pre construction installations (FIG. 1). Refer to SP5966-01 for 
detailed dimensions and installation specifications (see reverse)
The Rough-In Box is used in conjunction with the Wall Charging Station’s plastic 
back box. 
The Rough-In Box must be located behind 3/8" (0.95cm) to 3/4" (1.91cm) of wall/
mounting surface material.

The Rough-In Box bears a wing on each corner which is intended to bridge gaps 
between studs and/or spacers. These wings may be bent carefully in order to fit 
a particular gap, but may not be so bent as to allow the box to hang in a vertical 
position. 
Once placed in the desired position, put at least one screw through each wing 
into the adjoining stud or spacer to secure it.
The interior of the Rough-In Box contains a set of holes on either side, as well as 
top and bottom, for standard 1/4-inch screws. Use these holes to anchor the box 
to its adjoining studs or spacers.

Note

: Ensure that the Rough-In Box is flush with the 2x4 studs. Any overhang 

will affect the installation of the covering sheetrock, as well as affect the 
placement of the Plastic Back Box. The Rough-In Box has two sets of knockouts 
in the top and bottom, one of the set for US wiring and one for international 
wiring.

Note

: Make sure that the power cable has been pulled through the Rough-In 

Box by the resident electrician before continuing the installation. 

After completing the installation of the Rough-In Box, install sheet rock or other 
wall material over the box, cut a hole matching the size of the inside diameter in 
the sheet rock, and clean out all dust before proceeding with the installation of 
the plastic back box. 

CB-MVP-WCS52 (FG037-11) Specifications

Dimensions (HWD):

• 5 11/16" x 8 3/8" x 1 1/2" 
• 144.4 mm x 212.2 mm x 38.1 mm

Certifications

• UL 508A 

FIG. 1  

Typical CB-MVP-WCS52 Installation

Install front surface of 

Rough-In Box flush with 

surface of wall stud

FIG. 2  

Installation of Wall Unit