background image

Quick Start Guide

AutoPatch Single Bus Controllers

Overview

Single Bus Controllers (SBCs) are control devices programmed to route any 
input (source) to one assigned output (destination). SBCs are available in 3-Key and 
12-Key models and are compatible with any AMX AutoPatch Distribution Matrix with 
an XNNet compatible interface.

General Specifications

Installation

ESD Warning:  Avoid ESD (Electrostatic Discharge) damage to sensitive 
components; be sure you and the equipment are properly grounded before 
touching any internal materials.

This guide provides instructions for a typical installation using a single-gang box 
(customer supplied). For other installations, see Steps 9 through 11 before mounting 
the SBC.
Important:  If installing multiple SBCs, see the section on linking (on reverse) before 
mounting SBCs in boxes.

Mounting & Wiring the SBC

Power Requirements

+9 VDC @ 120 mA per SBC

Always use a UL approved power source. Check the power source’s 

documentation for information specific to that power source

Link Cable Requirements

Two-conductor, 20 AWG, 7/28 strand cable with a drain wire or shield, such as 

Alpha 2412C (customer supplied)

Maximum length of cable: 1,000 ft. (304.8 m) total, including linked SBCs

To mount in a single-gang box:

1.

Install a single-gang box in the desired location.

2.

Attach link cable to enclosure’s XNNet connector (on enclosure’s CPU). For 
exact CPU location and instructions for attaching a link cable, see router 
documentation.

3.

Route the link cable from the enclosure through the holes in the single-gang box.

4.

Attach power cable wires to the power source.

5.

Route power wires from power source through the holes in the single-gang box.

6.

Snap the bezel on the SBC.

7.

Carefully pierce the two gray circles near the top and bottom of the SBC 
faceplate that indicate the mounting holes (if not ordered pierced).

8.

Align faceplate with the single-gang box. (The unit may need to be tilted slightly 
to move the circuit board past the tabs.)

9.

Wire the SBC power connector P3. 
For the 2-digit SBC, use Steps 9a and 9b.
For the 3-digit SBC, use Steps 9c through 9e.

Wiring the Power Connector (P3)

2-digit SBC

3-digit SBC

Wiring the Link Connector (P4 or P5)

Wire the SBC Link connector, either P4 or P5. Steps 10 and 11 apply to both the 2-digit 
and 3-digit SBC.

10.

Loosen the two outer screws of the link connector (P4 or P5) on the circuit board 
on the rear of the SBC (FIG. 3 left for 2-digit SBC; FIG. 3 right for 3-digit SBC).

11.

Insert XNNet link cable wires into link connector.  Either wire goes into either 
outside slot. 
Tighten screws.

12.

Insert screws through mounting holes on SBC faceplate and holes on 
single-gang box (FIG. 2) and tighten.

FIG. 1  

Single Bus Controllers (SBCs) front view 

Specifications

Cable for 
XNNet Communications

Two-conductor, 20 AWG, 7/28 strand cable with drain wire or 
shield (such as Alpha 2412C) 
Distance 1000 ft. (304.8 m) total, including linked SBCs

Power

+9 VDC @ 120 mA 
Optional m9 VDC power supplies for up to three SBCs 
in close proximity

Operational Temperature

32° - 110° F (0° - 43° C)

Humidity

0 to 90% non-condensing

Dimensions

2.25 in. x 4 in. (5.72 cm x 10.16 cm)  
Bezel dimensions: 3 in. x 4.75 in. (7.62 cm x 12.07 cm)

Display

Two-digit or three-digit, seven-segment LED displays current 
input selected for routing to designated output

FIG. 2  

Route wires through single-gang box & attach to SBC

+

-

+

-

3-Key SBCs with bezel

12-Key SBCs with bezel

+

-

SB03

+

-

10

X

FIG. 3  

Attach XNNet link cable to P4 or P5

P3

Power

POS (+)

GND

cable

Chassis
ground
wire

Power
cable

POS (+)

GND

P3

Power cable

Link cable

P4

P5

P4

P5

Link cable

Chassis
ground
wire

2-digit SBC

3-digit SBC

Power cable

9a.    Loosen the left and center screws 

of the power connector P3 on the 
circuit board on the back of the 
SBC 
(see right).

9b.     Insert power cables wires; positive 

lead on the left and ground in 
center.
Tighten screws.

9c.     Loosen the top and center screws 

of the power connector P3 on the 
circuit board on the back of the SBC 
(see right).

9d.     Attach a chassis ground wire with a 

female quick disconnect to the
.250 x .032 tab. Connect the other 
end of the ground wire to a ground 
point.

9e.     Insert power cable wire; positive 

lead on top and ground in the 
center. 
Tighten screws.

Reviews: